EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 6, 2025 at 8:00 PM

Updated October 1, 2024

Site work, paving and outdoor lighting for a transportation facility in Osage City, Kansas. Completed plans call for site work for a transportation facility; for outdoor lighting for a transportation facility; and for paving for a transportation facility.

The intent of the contract isto provide for construction and completion, in every detail, of the work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the work in accordance with the plans, specifications, and terms of the contract. Question Deadline 04/04/2025 Questions regarding bids shall be directed to Kirkham, Michael & Associates, Inc. at cgaston@kirkham.com and ahazelton@kirkham.com no later than seven (7) calendar days prior to the bid opening. Disadvantaged Business Enterprise goal of 8.83% Project No. 9449423 Phase 1 Work consists of asphalt milling, crack repair, an asphalt overlay, and temporary pavement markings along runway 17/35 and taxiway connector. The duration of phase 1 is 25 working days. Phase 2 Work consists of asphalt milling, crack repair, and an asphalt overlay on the apron. The duration of phase 2 is 10 working days. Phase 3 Work consists of new MIRLs, threshold lights, runway end lights, new regulator and vault, as well as replacing and relocating the beacon. The duration of phase 3 is 40 working days. Phase 4 After a 30-day working holding period, work consists of permanent pavement markings along Runway 17/35, the taxiway connector, and apron and the installation of new apron tie downs. The duration of phase 4 is 5 working days. Site Directions: Osage City Municipal Airport is 1 mile east of Osage City. Questions regarding bids shall be directed to Kirkham, Michael & Associates, Inc. at cgaston@kirkham.com and ahazelton@kirkham.com The owner has established a contract goal of 8.83% participation for small business concerns owned and controlled by qualified Disadvantaged Business Enterprises (DBE). The bidder shall make and document good faith efforts, as defined in Appendix A of 49 CFR Part 26, to meet the established goal.

Bid Results

Transportation Terminals

$1,079,264.00

Public - City

Outdoor Lighting, Paving, Site Work

18

20

19

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
45
Bidding Soon
651
All Active Projects
299
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2025

May 12, 2025

img_map_placeholder

1613 Laing St, Osage City, KS


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.