Demolition and site work for a water / sewer project in Saint Peter, Minnesota. Completed plans call for the demolition of a water / sewer project; and for site work for a water / sewer project.
**As of May 24,2025, the project was awarded to Dirt Merchant, Inc..** Est. Completion Date: Nov. 11, 2025 Description: State Project Number 55SR0169 Demolition of Johnson Hall at Saint Peter Regional Treatment Center A. The work will be done under one prime contract that includes: Demolition construction. Question Deadline 04/11/2025 at 5:00 PM CT B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. Demolition of the Johnson Hall Building and related site infrastructure at the SPRTC, 100 Freeman Drive, Saint Peter, Minnesota. The Work will require above and below ground demolition, removal of building structures, selective concrete pavement removal, footing and foundation extraction, and utility capping. The Limits of Work are included in the Drawings. The Site consists of approximately 1 acre. The existing building is three stories tall and approximately 23,500 square feet in size. The specifications for this portion of the work are included in these specifications prepared by the ENGINEER. The Work includes protection of the adjacent roadways and buildings, site security, and site reclamation. Adjacent buildings are occupied and cannot be impacted through construction, demolition, or utility interruption. Work must not impact operations at the facility. Particular care must be taken to prevent damage to security fencing associated with Shantz Hall, immediately adjacent to Johnson Hall. Work will include removal of disconnected subgrade utilities to points shown on the project drawings. Terminating services within the tunnel system (mechanical, plumbing, electrical, fire protection) will be completed by the facility. The facility will assist with termination of the water main on the exterior of the building. Removal and disposal of unused utility systems is the responsibility of the Contractor. Additional work is included and described in the specification sections prepared by the CIVIL ENGINEER. Work will include the permanent closure of a tunnel opening resulting from tunnel demolition. Permanent infilling and water protection of the tunnel is to be completed by the Contractor. Water drainage must be installed for the portion of the tunnel that will be remaining. This Work includes the construction a gravel drive to connect the two adjoining, paved parking lots for use by site security. The adjoining tunnel that connects Johnson Hall to Shantz Hall will be demolished and capped as part of the Work. A drain for water intrusion into the portion of the tunnel that will remain shall be constructed. All removed trees shall be replaced 1:1 and all areas within the Limits of Work shall be reseeded. The Work will require continuous dust control, construction and maintenance of best management practice (BMP) erosion and storm water control features and on-going storm water management, and other miscellaneous work related to managing regulated wastes. Base Bid work consists of the demolition and disposal of building materials associated with Johnson Hall. Work will include removal of above-grade and below-grade systems as identified on the Drawings. Additional Description: This solicitation includes required insurance as recommended for the project's specifications and scope of work. It is highly encouraged potential responders review Section 00 73 16 Insurance Requirements as well as AIA A201, Article 11 of the solicitation before submitting a response. This Project does not have a Targeted Group, Economically Disadvantaged, Veteran-Owned Small Businesses (TG/ED/VO) subcontracting goal. Responding company has completed as a Prime Contractor, not as a Subcontractor, the work for at least one (1) contract which have achieved Substantial Completion since January 1, 2022, for General Contracting that involved similar project scope. Each of these contracts MUST have had a construction value of $200,000 or greater. OR In lieu of Responding company's projects, Responder may provide on the form below up to three (3) qualifying projects completed by the Project Manager while employed by others which have achieved Substantial Completion within the last seven (7) years for similar scope of work and had a construction value of $200,000 or greater. Project Manager and Job Superintendent responsible for this project EACH has had at least two (2) years of experience with general contracting construction of demolition with similar in scope and value to this project within the last seven (7) years. Each of these contracts must have had a construction value of $200,000 or greater. Document Information: The Section 00 41 73 Prime Contractor Response Form (Response Form), which includes the attachments listed in the project manual table of contents, is posted within the online area of the online Plan Room. The Response Form must be downloaded, completed, and uploaded with the bid before it can be posted. To view the Attachment C Qualification Form where the information above is located, as well as additional qualification requirements, go to the online area of the online plan room for this project and download the Response Form. All applicable attachments in the Response Form must be completed and uploaded before a bid can be posted in the online plan room. To view additional qualification requirements, go to the online area of the online plan room for this project and download the Response Form. All applicable attachments in the Response Form must be completed and uploaded before a bid can be posted in the online plan room.
Award
Water / Sewer
$327,524.00
Public - State/Provincial
Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 22, 2025
May 24, 2025
100 Freeman Dr, Saint Peter, MN
Related To This Project
Saint Peter, MN
Bid Date: May 20 2025
Saint Peter, MN
Bid Date: May 20 2025
Saint Peter, MN
Bid Date: Jun 03 2025
Saint Peter, MN
Bid Date: Jul 07 2025
Saint Peter, MN
Bid Date: Jul 23 2025
Saint Peter, MN
Bid Date: Sep 09 2025
Saint Peter, MN
Bid Date: Sep 22 2025
Saint Peter, MN
Bid Date: Oct 08 2025
Saint Peter, MN
Bid Date: Apr 10 2025
Saint Peter, MN
Bid Date: Mar 27 2025
Saint Peter, MN
Bid Date: Mar 27 2025
Saint Peter, MN
Bid Date: Aug 05 2025
Saint Peter, MN
Bid Date: Mar 07 2025
Saint Peter, MN
Bid Date: Jan 23 2025
Saint Peter, MN
Bid Date: Jan 23 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.