BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 2, 2025 at 8:00 PM

Updated May 3, 2025

Site work for a mixed-use development in Detroit, Michigan. Completed plans call for site work for a road / highway; and sidewalk / parking lot.

Remedial Investigation at LUST Site The work includes but is not limited to: Underground storage tank removal and disposal, contaminated soil excavation and disposal, contaminated water removal and disposal, supporting post-excavation soil sampling, excavation backfilling and site surface restoration, and submittal of project record documentation. ALL questions should be emailed to Julie Barton at bartonj@aktpeerless.com no later than 2:00 p.m., Eastern on April 11, 2025. 5% BID SECURITY REQUIRED

Bid Results

Roads / Highways

$384,518.00

Public - State/Provincial

Site Work

10

6

4

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
357
Active Projects
170
Bidding Soon
2,727
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2025

May 30, 2025

Project location map

7700 Fenkell Ave, Detroit, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.