EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 25, 2025 at 8:00 PM

Updated October 1, 2024

Site work and renovation of a civil project in Clarksville, Tennessee. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The Project includes the following Work: The work to be performed (Work) consists of the following: o Construction of A 6.5 MGD wastewater pump station, including wet well, electrical building, piping, pumps, electrical, instrumentation and control, site work, chemical storage, and associated appurtenances; Approximately 13,800 LF of 20-inch diameter and 1,140 LF of 16-inch diameter PVC force main, including 430 LF jack and bore and 1,007 LF horizontal directional drill (HDD); Approximately 650 LF of 12-inch diameter PVC gravity sewer; and o Demolition ofthe existing pump station. The Work is as shown on the Drawings and as set out more fully in the Specifications. Contractor shall provide all necessary materials, labor and equipment to complete the Work Bids are requested for the following single prime Contract. The Project has an expected duration of 545 days to Substantial Completion after the date when the Contract Times commence to run and 575 days to readiness for final payment after the date when the Contract Times commence to run. Bidders must be licensed contractors as required by Tennessee Code Annotated (TCA) 62-6-103 and 62- 6-112. Bidders are required to provide evidence of compliance with TCA Title 62, Chapter 6 before any Bidder's Bid may be considered. Bidders will be required to submit a Bid Security in the amount offive percent (5%) of Bidder's maximum Bid price in accordance with the Instructions to Bidders. Upon Contract award, the Successful Bidder must provide performance and payment bonds in accordance with the General Conditions, as may be modified by the Supplementary Conditions, at time of delivery of the executed Agreement to the Owner. Doc Notes: Obtaining the Bidding Documents The Issuing Office for the Bidding Documents is: CITY OF CLARKSVILLE CLARKSVILLE, TENNESSEE City of Clarksville (Owner) is requesting Bids for the construction of the following Project: Sherwood Forest & Ringgold Creek Wastewater Improvements (Bid No. 4725) Clarksville Gas & Water Engineering Department 2215 Madison Street Clarksville, TN 37043 Phone Number (931) 645-7418. Prospective Bidders may obtain or examine the Bidding Documents at the Issuing Office on Monday through Friday between the hours of 8:00am to 4:30pm, and may obtain copies ofthe Bidding Documents from the Issuing Office as described below. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including addenda, if any, obtained from sources other than the designated Issuing Office. Electronic Bidding Documents may be obtained at no cost from the Issuing Office upon email request, which shall be submitted to Astrid.Buchanan@cityofclarksvilie.com. Prospective Bidders must obtain Bidding Documents from the Issuing Office to be registered as Plan Holder and to be eligible to bid on the Project. All official notifications, addenda, and other Bidding Documents will be provided to Plan Holders. Question Deadline 04/18/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Mail: Troy Holland, PE Clarksville Gas and Water 2215 Madison Street Clarksville, TN 37043 B. Email: troy.holland@cityofclarksville.com

Post-Bid

Water / Sewer

$600,000.00

Public - City

Renovation, Site Work

99

37

28

5

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Project Meetings, Submittal Procedures, Certificates, Special Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer?s Field Services, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Temporary Parking Areas, Traffic Control, Temporary Barriers and Enclosures, Temporary Barricades, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Bonds, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete, Maintenance of Concrete, Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Precast Concrete, Precast Structural Concrete, Cast Decks and Underlayment, Grouting
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Brick Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Roofing and Siding Panels, Roof and Wall Specialties and Accessories, Roof Accessories, Snow Guards
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Flooring, Flooring Treatment, Fluid-Applied Flooring, Resinous Flooring, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats, Runners, Furniture, Residential Furniture, Beds
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Escalators and Moving Walks
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, HVAC Fans
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Transfer Switches, Automatic Transfer Switches, Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Embankments, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Watering, Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Sodding, Sprigging, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Gantry Cranes, Hoists, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
39
Bidding Soon
734
All Active Projects
352
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2025

May 26, 2025

img_map_placeholder

Multiple Locations, Clarksville, TN

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Sherwood Forest and Ringgold Creek Wastewater Improvements Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.