Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 29, 2025 at 8:00 PM
Updated April 30, 2025
Renovation of an educational facility in Saint Albans, Vermont. Completed plans call for the renovation of a educational facility.
The Maple Run School District (MRUSD) will be accepting bids from Mechanical Contractors for the replacement of the HRU-11 rooftop unit located at the BFA High School located at 71 South Main Street, City of St. Albans. The project involves the removal of the existing Rooftop unit, new roof curb, roof work, installation of the new Rooftop unit, electrical work, ceiling work, temperature control, and piping work. The contract documents are included within this RFP. For the purposes of this RFP, the MRUSD has pre-purchased the unit. Since the unit has a sixteen week lead time. The project award date is April 16, 2025. Pricing on the project to be held for the duration of the project. The project start date is June 15, 2025 and to be substantially completed by August 15, 2025 (schedule may be dependent upon lead time of equipment). Performance and Payment Bond: Provide a fixed amount for a Performance and Payment Bond for 100% of an assumed $100,000.00 Construction Cost. Bond costs for Change Orders shall be included in the markup percentage included elsewhere in this Bid. Any questions to be submitted by end of Day (EOD) of March 26, 2025 and responses will be provided by the EOD of March 31, 2025. Send question to: Owner's Project Manager Tom Yandow PCI : Capital Project Consulting (802) 923-6576 tyandow@pcivt.com This project consists of removing the existing Rooftop unit and replacing it with a new one. Roof work, steel work, Temperature Controls, ceiling work, ductwork modifications, piping modifications, and Electrical work is associated with this unit replacement. Mechanical Contractor will be the lead contractor for this project and is required to coordinate and procure all subcontractors to ensure a complete and finished project. Contractors need to follow the contract documents for the work as needed at the school. All questions will need to go through PCI Consulting. Point of contact at BFA - High School = Leonard Smith , cell phone = 802-
Post-Bid
Educational
$10,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 4, 2025
June 15, 2025
71 S Main St, Saint Albans, VT
Related To This Project
Saint Albans, VT
Bid Date: Apr 04 2025
Saint Albans, VT
--
Saint Albans, VT
Bid Date: May 19 2025
Saint Albans, VT
Bid Date: May 19 2025
Saint Albans, VT
Bid Date: Apr 29 2025
Saint Albans, VT
Bid Date: May 30 2025
Saint Albans, VT
--
Saint Albans, VT
Bid Date: Aug 08 2025
Saint Albans, VT
Bid Date: Mar 28 2025
Saint Albans, VT
Bid Date: Mar 28 2025
Saint Albans, VT
--
Saint Albans, VT
--
Saint Albans, VT
Bid Date: Feb 19 2025
Saint Albans, VT
--
Saint Albans, VT
Bid Date: Jan 10 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
