BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 29, 2025 at 8:00 PM

Updated April 30, 2025

Renovation of an educational facility in Saint Albans, Vermont. Completed plans call for the renovation of a educational facility.

The Maple Run School District (MRUSD) will be accepting bids from Mechanical Contractors for the replacement of the HRU-11 rooftop unit located at the BFA High School located at 71 South Main Street, City of St. Albans. The project involves the removal of the existing Rooftop unit, new roof curb, roof work, installation of the new Rooftop unit, electrical work, ceiling work, temperature control, and piping work. The contract documents are included within this RFP. For the purposes of this RFP, the MRUSD has pre-purchased the unit. Since the unit has a sixteen week lead time. The project award date is April 16, 2025. Pricing on the project to be held for the duration of the project. The project start date is June 15, 2025 and to be substantially completed by August 15, 2025 (schedule may be dependent upon lead time of equipment). Performance and Payment Bond: Provide a fixed amount for a Performance and Payment Bond for 100% of an assumed $100,000.00 Construction Cost. Bond costs for Change Orders shall be included in the markup percentage included elsewhere in this Bid. Any questions to be submitted by end of Day (EOD) of March 26, 2025 and responses will be provided by the EOD of March 31, 2025. Send question to: Owner's Project Manager Tom Yandow PCI : Capital Project Consulting (802) 923-6576 tyandow@pcivt.com This project consists of removing the existing Rooftop unit and replacing it with a new one. Roof work, steel work, Temperature Controls, ceiling work, ductwork modifications, piping modifications, and Electrical work is associated with this unit replacement. Mechanical Contractor will be the lead contractor for this project and is required to coordinate and procure all subcontractors to ensure a complete and finished project. Contractors need to follow the contract documents for the work as needed at the school. All questions will need to go through PCI Consulting. Point of contact at BFA - High School = Leonard Smith , cell phone = 802-

Post-Bid

Educational

$10,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
403
Active Projects
182
Bidding Soon
2,604
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2025

June 15, 2025

Project location map

71 S Main St, Saint Albans, VT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.