Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 17, 2025 at 8:00 PM
Updated March 29, 2025
Site work and paving for a civil project in Saint Albans, Vermont. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; and water / sewer project.
The Town of St. Albans, Vermont (the Town), with financial assistance provided by the State Natural Resources Conservation Council through the Vermont Department of Environmental Conservation Clean Water Investment Program, requests bids from qualified contractors to implement a culvert replacement and water quality improvements at a stream crossing on Fairfax Street in St. Albans. Details of the project are provided on the following pages and in the attached construction drawings prepared by Fitzgerald Environmental Associates (FEA). A project timeline is provided below. Instructions for submission of the bid sheet are also provided below. Summary of Work: This project consists of a culvert replacement and water quality improvement work at a stream crossing under Fairfax Street in St Albans. Work includes installing a Contech aluminum pipe arch, stabilizing an undercut stream bank, and road repaving as part of site restoration. The contractor will perform the work with an understanding of potential utility conflicts and permitting restrictions (defined limits of disturbance). A municipal waterline is located near the culvert and must be located (location and depth) prior to construction by the contractor. The Town will close Fairfax Street as needed during construction. Signage shall be installed by the contractor to inform drivers of the road closures. Contech will deliver and assemble the pipe arch structure on site June 15, 2025 Construction Begins * August 31, 2025 Project Completion Date Following the pre-bid meeting, questions about the scope of work should be emailed to Jordan Duffy at jordan@fitzgeraldenvironmental.com and David Allerton at d.allerton@stalbanstown.com The project will be subject to performance and payment bonds in the amount of 100% of the bid price, in addition to a requirement for a 5% bid bond.
Post-Bid
Bridges / Tunnels
$327,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 28, 2025
June 15, 2025
Fairfax St, Saint Albans, VT
Related To This Project
Saint Albans, VT
Bid Date: Mar 28 2025
Saint Albans, VT
Bid Date: Apr 04 2025
Saint Albans, VT
Bid Date: Apr 04 2025
Saint Albans, VT
--
Saint Albans, VT
Bid Date: May 19 2025
Saint Albans, VT
Bid Date: May 19 2025
Saint Albans, VT
Bid Date: Apr 29 2025
Saint Albans, VT
Bid Date: May 30 2025
Saint Albans, VT
--
Saint Albans, VT
--
Saint Albans, VT
Bid Date: Feb 19 2025
Saint Albans, VT
--
Saint Albans, VT
Bid Date: Jan 10 2025
Saint Albans, VT
Bid Date: Jan 17 2025
Saint Albans, VT
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
