BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 17, 2025 at 8:00 PM

Updated March 29, 2025

Site work and paving for a civil project in Saint Albans, Vermont. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; and water / sewer project.

The Town of St. Albans, Vermont (the Town), with financial assistance provided by the State Natural Resources Conservation Council through the Vermont Department of Environmental Conservation Clean Water Investment Program, requests bids from qualified contractors to implement a culvert replacement and water quality improvements at a stream crossing on Fairfax Street in St. Albans. Details of the project are provided on the following pages and in the attached construction drawings prepared by Fitzgerald Environmental Associates (FEA). A project timeline is provided below. Instructions for submission of the bid sheet are also provided below. Summary of Work: This project consists of a culvert replacement and water quality improvement work at a stream crossing under Fairfax Street in St Albans. Work includes installing a Contech aluminum pipe arch, stabilizing an undercut stream bank, and road repaving as part of site restoration. The contractor will perform the work with an understanding of potential utility conflicts and permitting restrictions (defined limits of disturbance). A municipal waterline is located near the culvert and must be located (location and depth) prior to construction by the contractor. The Town will close Fairfax Street as needed during construction. Signage shall be installed by the contractor to inform drivers of the road closures. Contech will deliver and assemble the pipe arch structure on site June 15, 2025 Construction Begins * August 31, 2025 Project Completion Date Following the pre-bid meeting, questions about the scope of work should be emailed to Jordan Duffy at jordan@fitzgeraldenvironmental.com and David Allerton at d.allerton@stalbanstown.com The project will be subject to performance and payment bonds in the amount of 100% of the bid price, in addition to a requirement for a 5% bid bond.

Post-Bid

Bridges / Tunnels

$327,000.00

Public - City

Paving, Site Work

9

4

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
403
Active Projects
195
Bidding Soon
2,640
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2025

June 15, 2025

Project location map

Fairfax St, Saint Albans, VT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.