BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 12, 2025 at 7:00 PM

Updated December 13, 2025

Site work and paving for a mixed-use development in Manchester, New Hampshire. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of December 12, 2025, this project has not yet been awarded. A timeline for the award has not yet been established. Project Description: The South Willow Street and Weston Road Project Involves Provisions for a New Northbound Right Turn Lane From South Willow Street Onto Weston Road, Reconstructed Sidewalks and Ada Compliant Crossings, Relocated Dunkin' Driveway, and Drainage Improvements. The Project Area Includes the Intersection of South Willow Street and Weston Road, Andrea Drive and Four Commercial Driveways. The Four Commercial Driveways Located Within the Project Area Are Not Under Signal Control, However the Shopping Plaza Commercial Entrance Located to the South of South Willow Street, Which Serves as the Westerly Leg of the South Willow Street and Weston Road Intersection is Under Signal Control. Questions About the Meaning or Intent of the Bidding Documents Are to Be Directed in Writing or by Email to the Engineer: Hdr 5 Bedford Farms Drive Suite 302 Bedford, Nh 03110 Questions Received Less Than Seven (7) Calendar Days Prior to the Date for Opening of Bids May Not Be Answered. Only Questions Answered by Formal Written Addenda Will Be Binding. Oral and Other Interpretations or Clarifications Will Be Without Legal Effect. Bidders Will Be Required to Furnish a Bid Bond in the Amount of 5% of the Total Bid, and the Successful Bidder Will Be Required to Furnish a Performance Bond and a Payment Bond Each in the Amount of 100% of the Contract Price. Questions Regarding This Project May Be Directed to Kristen Clarke at 624-6444 or Kclarke@manchesternh.gov. The Project is to Be Completed by September 30, 2026. The Right is Reserved to Waive Any Informalities in or Reject Any or All Bids and to Accept the Bid That is Deemed Most Favorable to the Interest of the City of Manchester.

Bid Results

Roads / Highways

$1,385,129.00

Public - City

Paving, Site Work

55

9

2

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
476
Active Projects
199
Bidding Soon
3,314
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 6, 2025

January 5, 2026

Project location map

S Willow St & Weston Rd, Manchester, NH


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.