Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 28, 2025 at 8:00 PM
Updated June 1, 2025
Remodeling of an elderly care / assisted living facility in Astoria, Oregon. Completed plans call for the remodel of a elderly care / assisted living facility.
Sealed or Electronic Proposals Will Be Received by Clatsop Care Center Health District for the Bidding and Construction Contract Administration of a Cosmetic Upgrade of the Third Floor of Clatsop Retirement Village in Astoria. Proposal Will Include an Introduction of the Firm, Construction Approach, Past Experience, Proposed Project Consultants, and Complete Fee Breakdown. B. Work Includes, but is Not Limited to: 1. Review Existing Site Conditions: Become Familiar With the Site, Building Conditions/location, and What Specialties Need to Be Engaged to Complete the Project. 2. New Design and Construction Coordination With the Architect/project Manager: Work With the Architectural Firm in Completion of the Project According to Design Plans Provided in This Request for Proposal. Review and Adhere to Construction Documents for the Construction of the Approved Design. In Addition to the Cosmetic Upgrade of Finishes, Coordination and Submittals to the State of Oregon Facility Planning and Safety for Approval of Overall Scope Which Will Include in the Common Areas New Flooring, Removal of Stub Walls Outside Tenant Units, Paint, Molding, and the Transition of Some of the Common Kitchen Areas Into Office Space. 3. Tenant Rooms: Livable Rooms Will Be Renovated 5 at a Time as Mthey Come Available Through Turnover of Occupants. Rooms Will Be Refreshed With New P-tac Unit, Flooring, Moldings, Kitchen Cabinetry, Appliances, Bathroom Cabinetry, Flooring, Overall Lightingm Package, and Fixtures. This Portion of the Project Will Be Ongoing. 3. Project Phasing Plan: Plan Work Phasing to Cause the Least Disturbance to the Users of the Mproject Space and to Neighboring Properties. Part 2 - Conditions and Scope of Work Guidelines 2.1 Add Office Space on the Third Floor Where Common Area Kitchenettes Currently Exist; Update Allm Ff&e on the Third Floor; Add P-tac Units Inside Resident Units; Update All Resident Units Including Mkitchen and Bathroom Areas. 2.2 Complete Project According to Construction Documents Which Include Architectural, Structural,m Fire, Mechanical and Electrical Plans to Meet All Applicable Building Codes. 2.3 Obtain and Supervise Any Subcontractors to Complete the Project as Designed. 2.4 Construction Professional (and Any Consultants) Are to Furnish Proof of Professional Mliability Insurance in the Amount of $1,000,000.
Post-Bid
Elderly Care / Assisted Living
$220,000.00
Public - City
Remodeling
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 31, 2025
June 30, 2025
947 Olney Ave, Astoria, OR
Related To This Project
Astoria, OR
Bid Date: Apr 25 2025
Astoria, OR
Bid Date: Apr 21 2025
Astoria, OR
Bid Date: Apr 15 2025
Astoria, OR
Bid Date: Apr 25 2025
Astoria, OR
Bid Date: May 08 2025
Astoria, OR
Bid Date: May 23 2025
Astoria, OR
Bid Date: May 08 2025
Astoria, OR
--
Astoria, OR
Bid Date: Apr 04 2025
Astoria, OR
Bid Date: Mar 20 2025
Astoria, OR
--
Astoria, OR
Bid Date: Feb 19 2025
Astoria, OR
Bid Date: Dec 12 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
