Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 4, 2025 at 8:00 PM
Updated April 5, 2025
Site work and paving for a mixed-use development in Minneapolis, Minnesota. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Reconstruct Franklin Avenue (CSAH 5) from Lyndale Avenue (CSAH 22) to Chicago Avenue in the City of Minneapolis. Purpose & Description: The existing roadway (last reconstructed in the 1960s) is nearing the end of its useful life and warrants replacement. Routine maintenance activities (such as overlays and crack seals) are no longer cost effective in preserving assets. The current roadway environment consists of a 4- lane undivided configuration with no turn lanes provided for people driving. This design has resulted in a relatively high number of crashes, specifically left-turn and rear-end related. No dedicated accommodations for people biking are currently provided along this segment of Franklin Avenue (CSAH 5). Although sidewalks are provided along both sides of the roadway, they do not offer a positive user experience for people walking. Not only are sidewalks located immediately adjacent to the roadway, but they also include a number of obstructions (such as utility poles, fire hydrants, and signal poles) within the walking path. Additionally, many pedestrian ramps do not meet current ADA design standards. These conditions present challenges for people walking, especially for those with limited mobility. In 2020, Transportation Project Delivery completed the Franklin Avenue Corridor Study (hennepin.us/franklincorridor) that evaluated both short term and long-term options for the corridor. It is anticipated that this project will provide an opportunity to implement recommendations from the study; relying on community input, data analysis, and environmental review to determine the specific location and type of improvement as part of the design process. The proposed project will include new pavement, curb, storm water utilities, sidewalk, ADA accommodations, and traffic signals. Further investigation will take place as part of the design process to determine the feasibility of dedicated accommodations for people biking as part of this project. Additionally, it is anticipated that proven traffic calming strategies (such as raised median, curb extensions, and streetscaping) will be introduced to improve the crossing experience for people walking by managing the speeds of people driving. Federal formula funding was awarded in both 2020 (CP 2172601) and 2022 (CP 2172602) through the Metropolitan Council's Regional Solicitation for this project. Construction Q3 2025 - Q4 2026 Completion 2027 This project is included in the County's 2025-2029 Capital Improvement Program (CIP). As of April 4, 2025, construction expected September 2025-December 2026. Completion in 2027. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Final Planning
Roads / Highways
$24,500,000.00
Public - County
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 30, 2025
E Franklin Ave, Minneapolis, MN
Related To This Project
Minneapolis, MN
--
Minneapolis, MN
Bid Date: Apr 17 2025
Minneapolis, MN
Bid Date: Apr 17 2025
Minneapolis, MN
Bid Date: Apr 24 2025
Minneapolis, MN
Bid Date: Apr 24 2025
Minneapolis, MN
Bid Date: May 01 2025
Minneapolis, MN
Bid Date: Apr 29 2025
Minneapolis, MN
--
Minneapolis, MN
Bid Date: May 01 2025
Minneapolis, MN
Bid Date: Apr 28 2025
Minneapolis, MN
Bid Date: Apr 15 2025
Minneapolis, MN
Bid Date: Apr 22 2025
Minneapolis, MN
Bid Date: Apr 17 2025
Minneapolis, MN
Bid Date: Apr 29 2025
Minneapolis, MN
Bid Date: May 02 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
