BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 27, 2025 at 8:00 PM

Updated June 28, 2025

Site work and paving for a sidewalk / parking lot in San Jose, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

General work description: Bus Stop Shelters. Question Deadline 04/23/2025 at 4:00 PM PT. Deadline to Submit Proposal : May 13, 2025, 10:45am The base Contract will contain order for twenty-one (21) bus shelters. The Contract delivery date for the 21 bus shelters must be no later than November 1, 2025. SCOPE OF WORK 1. Introduction, Background, and Overview Several of VTA’s bus stop shelters within our transit system’s network are well beyond their useful life cycle and have become obsolete. Many have been damaged, broken, or fallen into a state of disrepair. VTA’s Better Bus Stops Program is an overarching umbrella program that aims to make bus stop improvements. One of the many facets of this program is to identify areas where new or replacement bus shelters are warranted, dependent on factors such as ridership, developments, or Title VI requirements. The program also works closely with our Engineering Program and Delivery department to design specifications for shelters that we can apply to these various locations. This solicitation will establish a contract with a vendor to supply new and replacement bus stop shelters in a series of purchase orders, as VTA funds become available, over a period of five years. The contract includes an initial base order of twenty-one (21) bus stop shelters for delivery to VTA by November 1, 2025. Beyond the initial order, VTA may choose to exercise the bus shelter or item Options as funds become available. 1.1 Scope of work Contractor to: 1. Manufacture an initial base order of shelters that meet the specifications in Section 2 and in the attached “VTA Shelter Specifications Final” document. a. Shelter: Model #1, Quantity: 18 b. Shelter: Model #4, Quantity: 1 c. Shelter: Model #10, Quantity: 1 d. Shelter: Model #13, Quantity: 1 2. Deliver the initial order of shelters to VTA’s Cerone yard at 3990 Zanker Road, Building G. Receiving Dock, San Jose CA 95134 by November 1, 2025. 3. Manufacture and deliver additional orders of Model #’s 1 through 14 (outlined in the Bus Shelter Size section). The estimated total for the base order is 21 bus shelters with 80 bus shelter options, for an estimated total of 101 bus shelters if all options are exercised. For additional orders: VTA will provide Contractor with a written notice of VTA’s intent to exercise Options, as outlined in Exhibit A. Sample Contract, Section E. Option and Option Pricing. VTA may thereafter issue a purchase order which will include: 1. Model #’s and Quantities to be manufactured. 2. Delivery location(s) 3. Delivery dates(s) The contractor will deliver the shelters that are subject to a purchase order within four (4) months from the date VTA issues its purchase order.

Post-Bid

Sidewalks / Parking Lot

$200,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
330
Active Projects
161
Bidding Soon
2,634
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2025

September 29, 2025

Project location map

Multiple Locations, San Jose, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.