Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 12, 2025 at 7:00 PM
Updated November 13, 2025
Renovation of a detention facility in Plymouth, Minnesota. Conceptual plans call for the renovation of a detention facility.
This project will remodel approximately 18,800 USF within the Department of Community Corrections & Rehabilitation's (DOCCR) Men's Adult Correctional Facility (ACF) Support Services areas. Purpose & Description: The Adult Correctional Facility Men's Section in Plymouth is in need of remodeling to improve efficiency of service delivery and maintain a safe environment for staff and residents. This project will implement changes to support services areas as noted: The Laundry Room, located on the 1st floor, will require a new single-user ADA compliant toilet room and remodeling to provide an acoustic absorptive ceiling system to control noise levels produced by the machines in this space. Other areas of the first floor will need remodeling to provide ADA compliant accessibility and more efficient delivery of services. Work will be conducted in the following Support Service areas: library, staff offices, post office and canteen space swap, storage room, and staff break room. Total remodel area for this space is approximately 2,200 USF. Work in the first floor Medical Unit will include a refresh to the entire space of approximately 2,200 USF, including new furniture for the shared medical staff office space (6 workstations) and the Director of Nursing. A new HVAC Unit is required to provide conditioned air to the spaces on the first floor since no air changes exist in the current state in this zone. The total HVAC work area is anticipated to be approximately 2,600 USF. The second floor remodeling will focus on the Programing Office area to provide secure interview rooms, minor remodeling in offices, classrooms and new ergonomic office furniture in all the remodeled areas. New efficient LED light fixtures and new flooring will be provided in the remodeled areas. Total second floor remodel area is anticipated to be approximately 11,800 USF. Total project area is anticipated to be approximately 18,800 USF for all four areas combined. A planning effort will verify the project scope and schedule, which will most likely result in the cost estimate being revised and better defined. The project is included in the County 2026-2030 Capital Improvement Program (CIP). As of November 13, 2025, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Jails / Prisons
$500,000.00
Public - County
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2028
1145 Shenandoah Ln N, Plymouth, MN
Related To This Project
Plymouth, MN
Bid Date: Apr 03 2025
Plymouth, MN
Bid Date: May 09 2025
Plymouth, MN
--
Plymouth, MN
Bid Date: May 30 2025
Plymouth, MN
Bid Date: May 09 2025
Plymouth, MN
Bid Date: Jun 05 2025
Plymouth, MN
Bid Date: May 22 2025
Plymouth, MN
Bid Date: Apr 09 2025
Plymouth, MN
Bid Date: Apr 24 2025
Plymouth, MN
Bid Date: Apr 08 2025
Plymouth, MN
Bid Date: Mar 20 2025
Plymouth, MN
Bid Date: Mar 27 2025
Plymouth, MN
Bid Date: Feb 25 2025
Plymouth, MN
Bid Date: Feb 28 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
