Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 16, 2025 at 8:00 PM
Updated October 17, 2025
Site work and renovation of a mixed-use development in Minneapolis, Minnesota. Completed plans call for the renovation of a municipal facility; and for site work for a municipal facility.
This project will expand the loading dock, upgrade security scanning equipment, and improve site storage capacity on the lower level of the Hennepin County Government Center, located at 300 S. Sixth Street in downtown Minneapolis. Purpose & Description: The current Government Center lower level loading dock has maintained its original design layout since being built in the 1970's. Since the original design, security requirements such as scanning equipment, cameras, and physical security have been added to the space. Today, the loading dock is one of the smallest in the Minneapolis downtown metro area. Making the space not ideal in today's modern environment for the large amount of people, contractors, equipment, and supplies that are being funneled through the loading dock on daily basis. In 2023, the entire Digital Imaging Division located directly behind the lower level loading dock were relocated to floor A-9 of the Government Center. Vacating a large area directly behind the current loading dock's footprint. This vacated space can be re-utilized and would allow for a massive expansion of the entire loading dock area on the lower level. This project would triple space of the loading dock, allow for an upgrade in scanning equipment, improve visibility of physical security, increase on site storage, equipment staging, and enhance the flow and efficiency of deliveries. A schematic design study of this project was completed in 2023. Multiple floor layouts, inputs from security, facility managers, and users were incorporated into the 2023 schematic design study. This project is included in the County's 2025-2029 Capital Improvement Program (CIP). As of October 16, 2025, contractor awarded in March 2024. Construction began in May 2024 and was completed by November 2025.
Occupancy
Municipal
$3,200,000.00
Public - County
Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 1, 2024
300 South 6th St, Minneapolis, MN
Related To This Project
Minneapolis, MN
--
Minneapolis, MN
Bid Date: Apr 17 2025
Minneapolis, MN
Bid Date: Apr 17 2025
Minneapolis, MN
Bid Date: Apr 24 2025
Minneapolis, MN
Bid Date: Apr 24 2025
Minneapolis, MN
Bid Date: May 01 2025
Minneapolis, MN
Bid Date: Apr 29 2025
Minneapolis, MN
--
Minneapolis, MN
Bid Date: May 01 2025
Minneapolis, MN
Bid Date: Apr 28 2025
Minneapolis, MN
Bid Date: Apr 15 2025
Minneapolis, MN
Bid Date: Apr 22 2025
Minneapolis, MN
Bid Date: Apr 17 2025
Minneapolis, MN
Bid Date: Apr 29 2025
Minneapolis, MN
Bid Date: May 02 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
