Published April 18, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a civil project in Lafayette, Indiana. Completed plans call for site work for a water / sewer project.

Buck Creek - Colburn Wastewater Project Contract D Contract D- Wastewater Collection System, Colburn Gravity Sewer o 8,000 LF of 8" gravity Sewer o 5,965 LF of 4" force Main o One jack and bore railroad crossing o 33 sanitary sewer manholes o Two air release valves o Two wastewater pump stations o Four ejector stations o All other work for a complete and operable installation as shown on the plans and in written in the specifications The Project is funded partially by American Recovery Plan Act (ARPA) and partially by local County funds. The Issuing Office's representative and primary contact is Hall Block, EIT, who can be reached at (260) 422-2522 or via email at hblock@jprlsource.com. No bid may be withdrawn after the scheduled closing time for receipt of bids for at least 60 days to allow review of proposals before announcing award of contract. Each proposal shall be accompanied by a bid guaranty conforming to the Indiana Revised code. The bid guaranty shall be a certified check in an amount equal to five percent (5%) of the BID; or, a bond for five percent (5%) of the BID as surety for the execution of the contract. The bid bond or certified check should be made out to the Tippecanoe County Board of Commissioners. The bid bond form is included in the bidding documents. Should any BID be rejected, such certified check or bond shall be forthwith returned to the BIDDER, and should any BID be accepted, such certified check or bond will be returned upon the proper execution and securing of the Agreement. When the Agreement is executed, the certified check or bid bond of all unsuccessful BIDDERS will be returned. Proposals shall be properly and completely executed on proposal forms included in the Specifications. Proposals shall include all information requested by Indiana Form 96 (Revised 2013) included with the Specifications. Under Section III of Form 96, the Bidder shall submit a financial statement. A copy of the proposed Financial Statement to be submitted with the bid is included in the bid proposal documents section to the specifications. The Owner may make such investigations as deemed necessary to determine the ability of the Bidder to perform the work and the Bidder shall furnish to the Owner all such information and data for this purpose as the Owner may request. The Owner reserves the right to reject any bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy the Owner that such Bidder is properly qualified to carry out the obligations of the Agreement and to complete the work contemplated therein. The contractor to whom the work is awarded will be required to furnish, before commencing work, a performance and payment bond in an amount equal to the bid price of the contract awarded to said contractor, and certificates of all insurance required in the specifications. All bonds and liability insurance shall remain in effect for a period of twelve (12) months following completion and acceptance of construction. The award of the contract is subject to all approvals required by local agencies. Upon securing of all approvals, the successful bidder shall receive a "Notice to Proceed" with construction and said contractor shall begin construction activities within sixty (60) days of receipt of such notice, and shall complete the project pursuant to the contract documents. Each bidder is responsible for inspecting the Project Site(s) and for reading and being thoroughly familiar with the Contract Documents and Specifications. The failure or omission of any Bidder to do any of the foregoing shall in no way relieve any Bidder from any obligation with respect to the Bid. A conditional or qualified Bid will not be accepted. All applicable laws, ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the project throughout. Award will be made to the low, responsive, responsible bidder. The Tippecanoe County Board of Commissioners reserves the right to reject any Bid or all Bids, or to accept any Bid or Bids, or to make such combination of Bids as may seem desirable, and to waive any and all informalities in the bidding. Question Deadline 04/10/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: Karl Tanner, 317-289-4032, ktanner@tannerconsultingllc.net. Questions received less than seven days prior to the date for opening of Bids may not be answered.

GC Bidding

Water / Sewer

$300,000.00

Public - County

Site Work

56

21

32

4

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Construction Facilities, Temporary Construction, Vehicular Access and Parking, Traffic Control, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Concrete Curing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 08 - Openings

Division 08 - Openings

Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Flexible Connectors
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Controllers, Variable-Frequency Motor Controllers, Lighting, Interior Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Rough Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Landscape Grading, Turf and Grasses, Seeding, Plants, Shrubs
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Packaged Utility Wastewater Pumping Stations, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Manufacturing Equipment, Dies and Molds, Dies
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
65
Bidding Soon
767
All Active Projects
362
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2025

May 13, 2025

img_map_placeholder

Multiple Locations, Lafayette, IN

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Buck Creek - Colburn Wastewater Collection System - Contract D Colburn Gravity Sewer

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.