BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 13, 2025 at 8:00 PM

Updated September 12, 2025

Site work, paving and outdoor lighting for a mixed-use development in Port Orchard, Washington. Completed plans call for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

**As of May 13, 2025, the project was awarded to Beisley Enterprises LLC, with an awarded amount of $462,994.80.** The project consists of work to be performed within 75 working days from notice to proceed, and consists of furnishing all materials, equipment, tools, labor, and other work or items incidental theretofore and as generally described as follows: Resurfacing of existing tennis court to accommodate both pickleball and tennis, renovation of existing basketball court to accommodate futsal and basketball, fencing around courts, addition of hillside stair and concrete seat walls, addition of ADA compliant sidewalk to courts, and improvements to sports court lighting. The Engineer's construction estimate for this project is $434,477.81. The below construction estimates are a breakdown of the Base Bid and all Bid Alternates. Base Bid: $187,882.81 Bid Alternate 1: $116,743.75 Bid Alternate 2: $8,000 Bid Alternate 3: $31,390 Bid Alternate 4: $39,452.50 Bid Alternate 5: $51,008.75 All bid proposals shall be accompanied by a bid security (bid deposit) in the form of a cash deposit, certified or cashier’s check, postal money order, or surety bond made payable to the City of Port Orchard, for a sum not less than five percent (5%) of the amount of such bid, including sales tax. Should the successful bidder fail to enter into such contract and furnish satisfactory payment and performance bonds within the time stated in the Specifications, the bid security (bid deposit/bond) shall be forfeited to the City of Port Orchard. Pre-Bid Conference None The award of the Contract will go to the qualified bidder submitting the lowest responsible and responsive bid. The City reserves the right to reject any and all bids or waive any informality or irregularity in the bidding and make the award as deemed to be in the best interest of the City and the public.

Award

Playgrounds / Parks / Athletic Fields

$462,995.00

Public - City

Outdoor Lighting, Paving, Site Work

17

15

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
188
Active Projects
87
Bidding Soon
1,344
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2025

May 14, 2025

Project location map

Tacoma Ave & Sroufe St, Port Orchard, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.