BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 12, 2025 at 8:00 PM

Updated June 13, 2025

Site work and paving for a mixed-use development in Novato, California. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

2025 Annual Pavement Rehabilitation The work to be done includes but is not limited to rehabilitation of the pavement on Clay Court from Alameda Del Prado to private portion, Grant Avenue between Eighth Street and Seventh Street, Indian Valley Road from Chamberlain Avenue to westerly city limits, southbound Redwood Blvd from Rowland Blvd to 150 feet north of Rowland Blvd, Rowland Blvd from Redwood Blvd to South Novato Blvd and Sherman Avenue between DeLong Ave and Grant Ave. The improvements will include placement of hot mix asphalt pavement materials such as pavement overlay, and mill and fill; setup and maintenance of traffic control systems; construction of curb ramps, sidewalk, curbs & gutters; utility adjustments, roadway excavation, culvert replacement, headwall construction, and trench backfill; replacement of pavement striping and markings, installation of new traffic signs and other items or details not mentioned above that are required by the contract documents. Question Acceptance Deadline 04/10/2025 05:00 PM EDT General Requirements - Certified Payroll - Contractors License Required - Insurance Required - License Required - Material Safety Data Sheets Required - Prevailing Wage Required Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Maintenance Bond 50 % - Payment Bond 100 %

Award

Roads / Highways

$1,674,346.00

Public - City

Paving, Site Work

26

10

2

4

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
15
Bidding Soon
1,893
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2025

June 16, 2025

Project location map

Multiple Locations, Novato, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.