BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 26, 2026 at 8:00 PM

Updated July 8, 2026

Renovation of a fire / police facility in Waterbury, Connecticut. Completed plans call for the renovation of a fire / police facility.

https://www.wiltonbulletin.com/waterbury/article/waterbury-firehouse-renovations-fire-station-1-21045170.php WATERBURY— Firefighters at Fire Station 1 have been deployed to stations throughout the city while the firehouse undergoes a $5.7 million renovation. Up and coming pre-teen golfer from Connecticut is already a city champion at age 11Up and coming pre-teen golfer from Connecticut is already a city champion at age 11 Watch More exp-customer-logo The firehouse at 1979 North Main St. closed two weeks ago as part of the department's ongoing plan to renovate its eight firehouses to bolster operations and service capabilities while ensuring long-term readiness, fire officials said. FALL SALE: 3 months for 25¢. Access your go-to source for essential news this season. ACT NOW As the city renovates one station, it will move on to the next. Each project is expected to cost several million dollars. Mayor Paul Pernerewski described the firehouse conditions across the city as appalling. "They all need renovation," he said. "They're old and horribly run down and in need of upgrades." Personnel, apparatus, and resources from Fire Station 1 will be "strategically redeployed" to other stations throughout the city to maintain full emergency response coverage for all residents and businesses during the closure, fire officials said in a news release. "The department has worked closely with city officials to ensure that public safety remains unaffected during this transition," officials said in the release. Advertisement Article continues below this ad Fire Chief Javier Lopez said all available manpower will be assigned to the closest stations on Walnut Avenue and Willow Street. Also, instead of dispatching by geography, responding crews will be dispatched by GPS. If a crew is returning from a call or a training and are near a reported fire, they will be dispatched first. Fire Station 1 is expected to reopen in June 2026 following upgrades that will modernize the station, upgrade sleeping and cooking quarters and provide a safer, more efficient working environment for city firefighters, officials said. The city has completed work on Fire Station 6 on Willow Street, which needed significant upgrades to its rickety wooden stairs and failing railings. Asbestos inside the walls needed to be removed and the floor, built in 1907, was replaced with a much stronger structure, officials said. Station 7 at 315 Walnut St. in Waterbury, was in the most need of work and had not had significant upgrades since construction, officials said. Station 7 at 315 Walnut St. in Waterbury, was in the most need of work and had not had significant upgrades since construction, officials said. Hearst Connecticut Media "The floor that held the truck was not made for a 38,000-pound fire engine," said fire department spokesman Capt. Edward Partridge. "When you can't hold the fire truck from falling into the basement, that's a problem." Advertisement Article continues below this ad Fire Station 7 on Walnut Street was in the most need of work and had not had significant upgrades since construction. Asbestos was found in all the walls, plumbing and electrical also had to be brought to code, Partridge said. The cost to complete the work was $2.7 million, Partridge said. After completion of Station 1, the city is expected to begin small renovations at the kitchens in Station 4 and 6, he said. Not all the stations will be improved but "most of them need some work," Partridge said. The renovation is a top priority for new chief Lopez who took over the helm of the department in June. The city has 230 firefighters, and responds to about 22,000 calls annually. Advertisement Article continues below this ad A fire engine site in the single bay of Waterbury Fire Station 5 on East Main Street in Waterbury. The city is looking to build a new station in the East End. A fire engine site in the single bay of Waterbury Fire Station 5 on East Main Street in Waterbury. The city is looking to build a new station in the East End. Jim Shannon/Hearst Connecticut Media The city is also searching for space in the East End to build a new station for coverage in that area, but officials had no further details. A previous plan to expand Fire Station 5 on East Main Street fell through, the mayor said. Pernerewski said the firehouse improvement project sends a message to firefighting staff that the city values them. Advertisement Article continues below this ad "If you’re putting people in second-rate or third-rate or fourth-rate living quarters, I think there is a subtle message there that says you’re not a priority for us, and I don’t think that’s true,” Pernerewski said. ------------------------------------------------ https://www.ncadvertiser.com/waterbury/article/waterbury-north-side-firehouse-renovation-20324725.php Waterbury's North Side Firehouse renovation project estimated to cost $5.5 million _______________________ The City of Waterbury, Fire Department is seeking from third parties, proposals and prices to furnish all labor, materials, equipment and incidental required for renovation at Fire Station No. 1. Contact Information mmccauley@waterburyct.org. Clarification Deadline: 4/16/2025 2:00 PM

Bid Results

Fire / Police

$5,564,734.00

Public - City

Renovation

86

29

10

2

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,195
Active Projects
502
Bidding Soon
7,921
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2025

May 29, 2025

Project location map

1979 N Main St, Waterbury, CT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.