BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 4, 2025 at 8:00 PM

Updated June 27, 2025

Site work and paving for a civil project in Concord, California. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.

Q&A Deadline 04/22/2025 5:00 PM (PDT) = Contact Info Bid Administrator bidcoordinator@ccwater.com The Work includes but is not limited to: For Culvert 24 - Removing and relocating existing rip rap; removing and disposing of existing water-filled traffic barriers; removing and disposing of existing polyethylene sheeting; removing and disposing of existing temporary traffic signage; demolishing and disposing of existing storm drain facilities; trimming or removal of trees and brush and associated disposal; grading of embankments to prepare for installation of improvements; furnishing and installing new storm drain facilities including trenching, backfilling, and repaving; furnishing and installing a new soldier pile retaining wall with associated backfilling and paving; furnishing and installing a new traffic guardrail system; furnishing and installing new jute mesh fabric and rip rap for slope protection, performing roadway restriping; and performing related required work as shown on the Volume 1 drawings and specified herein (including Volume 1 of Division 2 specification sections) to make a complete project. For Buckeye Canyon Road Sites 5 and 6 - Removing and disposing of excess slide material; furnishing and installing a new soldier pile retaining wall with associated backfilling; furnishing and installing new storm drain facilities including trenching and backfilling; furnishing and installing a new traffic guardrail system; furnishing and installing new geotextile fabric and rip rap for slope protection; furnishing and installing temporary K-rail traffic barriers at specified sites along Buckeye Canyon Road during construction; and performing related required work as shown on the Volume 2 drawings and specified herein (including Volume 2 of Division 2 specification sections) to make a complete project. The location of the project site is the Los Vaqueros Watershed in Livermore, California. Project is to be completed within 155 consecutive days

Award

Bridges / Tunnels

$2,199,530.00

Public - County

Paving, Site Work

33

23

26

8

Subscribe For Documents

56 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
10
Bidding Soon
1,653
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2025

July 9, 2025

Project location map

Multiple Locations, Concord, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.