Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 21, 2025 at 8:00 PM
Updated May 14, 2025
Site work and new construction of a water / sewer project in Concord, California. Completed plans call civil work for a water / sewer project.
The Work includes, but is not limited to, mobilization and demobilization, locating and field marking CCWD facilities and otherwise satisfying CCWD’s USA North (811) obligations, installation of approximately 1-mile of 6-inch and 8-inch diameter ductile iron (DI) and upgraded polyvinyl-chloride (PVC)(iPVC DR 18 and/or PVC DR 14 are considered upgraded PVC) water pipelines and appurtenances, installation of temporary above ground piping (topline), installation of cathodic protection, installation of hydrants, relocation of meters and meter boxes, abandonment in place of existing pipelines and appurtenances including abandonment via slurry fill of pipes that are 8-inches and larger in diameter, furnishing and transporting all materials, excavation, sheeting, shoring, bracing, draining, collection and disposal of all treated water contained within the existing pipes and all water used to flush new installed pipes, disposal of any ground water encountered to the local storm drain in accordance with all applicable requirements referenced in Paragraph 01060-2.1, DEWATERING – GOVERNING REGULATIONS, whichever is more stringent, for discharge of water to the local storm drain systems, backfill, compaction, site restoration, tie-ins and renewal and replacement of water service laterals including installation of new meters, meter boxes, concrete and asphalt concrete (AC) pavement surface repairs and restoration, curb, gutter and sidewalk concrete repairs and restoration, preparing and administering traffic control, and obtaining an encroachment permit from Contra Costa County Public Works. The location of the project site is within unincorporated Contra Costa County. Project is to be completed within 365 consecutive days from the date specified in the Notice to Proceed. Time for commencement and completion of the Work is important, and is to be of the essence of the Contract
Post-Bid
Water / Sewer
Public - City
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 13, 2025
July 7, 2025
To Be Determined, Concord, CA
Related To This Project
Concord, CA
--
Concord, CA
Bid Date: Jun 23 2025
Concord, CA
--
Concord, CA
Bid Date: Jul 01 2025
Concord, CA
Bid Date: Jun 03 2025
Concord, CA
Bid Date: Aug 22 2025
Concord, CA
Bid Date: Jun 05 2025
Concord, CA
Bid Date: May 29 2025
Concord, CA
Bid Date: May 01 2025
Concord, CA
Bid Date: May 01 2025
Concord, CA
Bid Date: May 01 2025
Concord, CA
Bid Date: Apr 17 2025
Concord, CA
Bid Date: May 01 2025
Concord, CA
Bid Date: Apr 25 2025
Unlock Your Potential with Access to Commercial Construction Data
Sign up now to get free company and project data. No payment required.
