Site work and new construction of a playground / park / athletic field in Concord, California. Completed plans call for the construction of a playground / park / athletic field; and for site work for a playground / park / athletic field.

** As of April 15,2025, project were canceled. No definite date for the rebid.** Scope of work: New 1600 sf conference meeting room inside existing warehouse. Fire taped Gypsum Board Ceiling and Walls, framed to support light density storage above. 10' interior ceiling height. (2) 10x2 windows for exteriorlight.Added support in walls to support largeAVmonitors.Includes (3) pair man doors with lockset. 2x4LEDsurfacelighting. Electrical per codeforduplexes, dedicated circuits (4). IT drops from existing server room to new room. Includes allowance for debris removal, cleanup. 1. Electrical: a. Install ceiling lights using low profile LED flush mount fit for drop ceiling with LED colortemperatureof3500K.Combined outputgreaterthan 8,000lumens.West Gate LPNG Series Commercial Light: LPNG-2X4-MCTP4. b. Install ceiling light fixtures. c. Install 2x4LEDsurface lighting. Electrical per codefor duplexes, dedicated circuits. d. Wire network with CAT6 Ethernet cable. 2. Glazing: a. Install two new double-paned window - single slider vinyl with dual pane insulated glass. 3. Flooring: a. Install new carpet flooring with minimum 8 lb. density padding. b. Install new carpet flooring (approx. 1600 square feet) 4. Wall and Demo: a. Install new walls with insulation (Item 5). 5. Insulation: a. Install new wall thermos insulation of minimum R-13 6. Door: a. Install three double doors. b. Install all door hardware including lock. 7. Ceiling: a. Install new drop ceiling (see ceiling lights under Electrical) 8. Painting: a. Two coats of paint on all interior walls and ceiling b. Two coats of paint on new exterior walls (two sides only). c. Color selection and finish - TBD Location and Description. The Project is located at 1425 Gasoline Alley, Concord, CA, and is described as follows: Parks Training Room Build-out - 1600 sf conference meeting room inside existing warehouse. The Project must be fully completed within sixty (60) calendar days from the start date set forth in the Notice to Proceed. City anticipates that the Work will begin on or about May 5, 2025, but the anticipated License. This Project requires a valid California contractor's license for the following classification(s): B - General Building Contractor. The Bid Proposal must be accompanied by bid security of ten percent of the maximum bid amount, in the form of a cashier's or certified check made payable to City, or a bid bond executed by a surety licensed to do business in the State of California on the Bid Bond form included with the Contract Documents. The bid security must guarantee that within ten days after City issues the Notice of Potential Award, the successful bidder will execute the Contract and submit the payment and performance bonds, insurance certificates and endorsements, valid Certificates of Reported Compliance as required under the California Air Resources Board's In-Use Off-Road Diesel-Fueled Fleets Regulation (13 CCR 2449 et seq.) ("Off-Road Regulation"), if applicable, and any other submittals required by the Contract Documents and as specified in the Notice of Potential Award. The successful bidder will be required to provide performance and payment bonds, eachfor 100% of the Contract Price, as further specified in the Contract Documents Question Deadline 04/10/2025 at 5:00 PM PT

Bid Results

Playgrounds / Parks / Athletic Fields

$154,548.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
557
Active Projects
300
Bidding Soon
3,024
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2025

May 15, 2025

Project location map

1425 Gasoline Alley, Concord, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.