BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 12, 2025 at 8:00 PM

Updated May 14, 2025

Demolition, site work, new construction, renovation and addition to a municipal facility in Wetumpka, Alabama. Completed plans call for the addition of a municipal facility; for the demolition of a municipal facility; for the construction of a 27,325-square-foot, two-story above grade municipal facility; for the renovation of a municipal facility; and for site work for a municipal facility.

The project consists of two phases. Phase One consists of the construction of a two-story administrative building of approximately 27,325 square feet located adjacent to the existing Elmore County Judicial Complex located in Wetumpka, Alabama. The building will house the Court Clerk's offices, including record storage and secure vault. Additionally, the building will house the Sheriff's Administrative offfices and investigative functions, evidence storage, as well as the public facing functions of the Sheriff's offices. The new building will be fully sprinklered and connected to the existing facility by an enclosed walkway to allow secure access for staff between both facilities. Phase Two will consist of the selective demolition and renovation of portions of the existing Judicial Building to incorporate two new district courtrooms and required support areas, relocation and consolidation of the Adult Probation and Parole Offices, renovation to the judges' suite to add offices for new judges, update the finishes in the judges' suite and existing courtrooms. The low-slope roof will be removed and replaced with a new membrane roof system including new insulation, reworking the drainage and extending the curbs on roof mounted equipment to allow proper flashing. In addition, the existing fire-alarm system will be replaced. Underground utilities, grading, and sitework will be part of the project. A cashier's check or Bid Bond payable to the Elmore County Commission in an amount of not less than five percent (5%) of the amount of the proposal, but in no event more than $10,000 must accompany the bid. Performance and Statutory Labor and Material Payment Bonds in the amount of one-hundred percent (100%) of the Contract Price will be required at the signing of the Contract. Performance Time: The project is a two phase project and is to be complete within 480 calendar days for Phase One and an additional 180 calendar days for Phase Two from the Notice to Proceed.

Post-Bid

Municipal

$1,338,925.00

Public - County

Addition, Demolition, New Construction, Renovation, Site Work

201

36

98

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
36
Bidding Soon
620
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2025

June 30, 2025

Project location map

8935 US-231, Wetumpka, AL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.