BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 17, 2025 at 8:00 PM

Updated November 7, 2025

Site work and paving for a mixed-use development in Morris, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Each bid must be accompanied by a bid bond, payable to the City of Morris, in an amount not less than five percent (5%) of the total bid as a guarantee that the bidder, if successful, will enter into a contract with the City for the work described in the proposal. This deposit will be subject to forfeiture as provided by law. Bid security must be furnished in accordance with the Instructions to Bidders. work shall consist of grading, aggregate base, bituminous surface, concrete curb and gutter, and utilities within the City of Morris, Minnesota. The major estimated construction items are: Exc. - Common CY 12,503 Aggregate Base CL5 CY 3770 Select Granular Embankment CY 12,395 Type SP 12.5 Bituminous Mix TON 4186 Concrete Walk SF 11,844 Concrete Curb & Gutter LF 8875 RC Storm Sewer LF 4293 LOCATION: E. 7th Street between Line Dr and US Hwy 59 All other prevailing wage violations and questions should be sent to: Department of Labor and Industry Prevailing Wage Section 443 Lafayette Road N St Paul, MN 55155 (651) 284-5091 DLI.PrevWage@state.mn.us

Bid Results

Roads / Highways

$2,096,091.00

Public - City

Paving, Site Work

4

5

19

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
13
Bidding Soon
273
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2025

June 1, 2025

Project location map

E 7th St, Morris, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.