Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 28, 2025 at 8:00 PM
Updated April 29, 2025
Site work and paving for a civil project in Mauston, Wisconsin. Completed plans call for site work for a bridge / tunnel; road / highway; and for paving for a road / highway.
The Project includes the following Work: The overall project will consist of pulverize & overlay of approximately 15,000 LF of Juneau CTH O (from Franklin St to Leverenz Rd) with approximately 400 LF of complete roadway reconstruction including new base aggregate, removal and replacement of three box culvert/bridge structures, culvert replacements, paving with 4.0-inches of asphalt, ditching, and side slope grading. The anticipated substantial completion date is October 18, 2025 and final completion date is November 1, 2025. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the Owner as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the Owner as liquidated damages. Owner reserves the right to waive any informalities or to reject any or all bids. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Brian Kehrli, PE, (608) 355-8887 | bkehrli@msa-ps.com. Questions received less than seven days prior to the date for opening of Bids may not be answered. PN - 1G-2406014
Award
Roads / Highways
$2,478,601.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 10, 2025
May 12, 2025
CTH O, Mauston, WI
Related To This Project
Mauston, WI
Bid Date: Apr 25 2025
Mauston, WI
Bid Date: May 15 2025
Mauston, WI
--
Mauston, WI
Bid Date: Jun 18 2025
Mauston, WI
Bid Date: Jun 04 2025
Mauston, WI
Bid Date: Aug 05 2025
Mauston, WI
Bid Date: Aug 07 2025
Mauston, WI
Bid Date: Aug 18 2025
Mauston, WI
Bid Date: Apr 15 2025
Mauston, WI
Bid Date: Mar 28 2025
Mauston, WI
Bid Date: Mar 13 2025
Mauston, WI
Bid Date: Mar 13 2025
Mauston, WI
Bid Date: Feb 18 2025
Mauston, WI
--
Mauston, WI
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
