Published December 18, 2025 at 7:00 PM
Updated December 19, 2025
Site work and paving for a civil project in Mauston, Wisconsin. Conceptual plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; and bridge / tunnel.
Limit :24TH Avenue TO USH 12/16/Exit 85 The pavement needs treatment to extend its service life. Perpetuation project to resurface the pavement of IH 90 from 0.2 miles west of 24th Avenue, where Project 1016-06-79 ended to B-29-18 and B-29-19, where Project 1014-00-75 begins in Juneau County. The interchange at Exit 79 (Lyndon Station) is included. Design base patch for the existing concrete pavement as needed. Overlay with 4 inches of asphaltic pavement. Update beam guard to current standards. Adjust /replace cable guard as needed due to grade change attributed to the overlay. Some minor slope grading may be required for beam guard replacements and cable guard replacements. Replace Type 1 (large green) signs, place a High Friction Surface Treatment on the two curves just north of exit 85, culvert lining, repairs, and clearing and grubbing. Structure B-29-21 will receive clean and paint girder ends at substructures, repair CS3 spall, repair wide crack at S abutment at west end, repair asphalt drainage flume at SE corner, replace object marker at SE corner. Structure B-29-23 will receive Joint repair/replacement at both abutments, repair spalls and delamination at deck near N and S abutments, clean and paint girder ends and areas of joint repair, repair CS3 spalls and deteriorated abutment backwalls, locations at S abutment in the majority of the main body), epoxy fill cracks at N and S abutments, repair spalls at pier, spalls at both ends of P2), epoxy repairs, remove existing concrete jackets at pier columns and replace with FRP jackets Anticipated Construction Cost: $17,000,000-$19,999,999 The Method of Contractor Selection Has Not Been Determined at This Time. WIDOT - RFP Engineering - Mauston - Wisconsin Dells - IH 090E *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Roads / Highways
$19,999,999.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 1, 2026
I-90, Mauston, WI
Related To This Project
Mauston, WI
Bid Date: Feb 04 2026
Mauston, WI
Bid Date: Feb 18 2026
Mauston, WI
Bid Date: Feb 23 2026
Mauston, WI
Bid Date: Aug 18 2025
Mauston, WI
Bid Date: Aug 07 2025
Mauston, WI
Bid Date: Aug 05 2025
Mauston, WI
Bid Date: Jun 04 2025
Mauston, WI
Bid Date: Jun 18 2025
Mauston, WI
Bid Date: Mar 10 2026
Mauston, WI
Bid Date: May 15 2025
Mauston, WI
Bid Date: Apr 25 2025
Mauston, WI
Bid Date: Apr 10 2025
Mauston, WI
Bid Date: Apr 15 2025
Mauston, WI
Bid Date: Mar 28 2025
Mauston, WI
Bid Date: Mar 13 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.