BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 18, 2025 at 7:00 PM

Updated December 19, 2025

Site work and paving for a civil project in Mauston, Wisconsin. Conceptual plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; and bridge / tunnel.

Limit :24TH Avenue TO USH 12/16/Exit 85 The pavement needs treatment to extend its service life. Perpetuation project to resurface the pavement of IH 90 from 0.2 miles west of 24th Avenue, where Project 1016-06-79 ended to B-29-18 and B-29-19, where Project 1014-00-75 begins in Juneau County. The interchange at Exit 79 (Lyndon Station) is included. Design base patch for the existing concrete pavement as needed. Overlay with 4 inches of asphaltic pavement. Update beam guard to current standards. Adjust /replace cable guard as needed due to grade change attributed to the overlay. Some minor slope grading may be required for beam guard replacements and cable guard replacements. Replace Type 1 (large green) signs, place a High Friction Surface Treatment on the two curves just north of exit 85, culvert lining, repairs, and clearing and grubbing. Structure B-29-21 will receive clean and paint girder ends at substructures, repair CS3 spall, repair wide crack at S abutment at west end, repair asphalt drainage flume at SE corner, replace object marker at SE corner. Structure B-29-23 will receive Joint repair/replacement at both abutments, repair spalls and delamination at deck near N and S abutments, clean and paint girder ends and areas of joint repair, repair CS3 spalls and deteriorated abutment backwalls, locations at S abutment in the majority of the main body), epoxy fill cracks at N and S abutments, repair spalls at pier, spalls at both ends of P2), epoxy repairs, remove existing concrete jackets at pier columns and replace with FRP jackets Anticipated Construction Cost: $17,000,000-$19,999,999 The Method of Contractor Selection Has Not Been Determined at This Time. WIDOT - RFP Engineering - Mauston - Wisconsin Dells - IH 090E *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Roads / Highways

$19,999,999.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
110
Bidding Soon
843
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2026

Project location map

I-90, Mauston, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.