BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 5, 2026 at 7:00 PM

Updated February 6, 2026

Site work and paving for a sidewalk / parking lot in Mauston, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

GPC - Parking Lot Pavement Improvements - In general, the work consists of: reconstruction of existing parking lot pavement and base with reduction in overall footprint; site grading improvements including installation of concrete curb/flume drainage way, pipe underdrains, parking lot surface grade adjustment; and widening of drainage way at the southern limits; extension of outdoor lighting (parking lot lights) utilizing LED fixtures; addition of a dumpster enclosure with swing gates; excavation/grading/base aggregate for additional parking stalls at the front of the building; construction of concrete sidewalk; and surface restoration including pavement marking and turf restoration. Question Deadline 02/06/2026 Bidders shall request clarification or interpretation within ten (10) days before GPC bid opening too the Architect/Engineer's online . Neither the Architect/Engineer nor DFD will be responsible for verbal instructions. Bid(10%), Performance(100%), Payment(100%), Certified Check MBE (2%), WBE (12%)

GC Bidding

Sidewalks / Parking Lot

$520,000.00

Public - State/Provincial

Paving, Site Work

23

18

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
114
Bidding Soon
838
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2026

May 1, 2026

Project location map

Multiple Locations, Mauston, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.