Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 4, 2025 at 8:00 PM
Updated April 29, 2025
Renovation of an educational facility in Sparta, Michigan. Completed plans call for the renovation of a educational facility.
Bids to furnish and install Elkay filtered water coolers with bottle filling stations district wide to comply with Filter First legislation. RFP questions: Thomas Glusa, Director of Facilities (616)887-8253 Ext. 5214 Thomas.glusa@spartaschools.org Bidder qualifications: o Companies shall be an organization with at least five (5) years of experience in this scope of work o Companies shall be licensed and insured for this scope of work o Companies shall have the financial resources to compete this scope of work Bid details: o All work must meet the Clean Drinking Water Act of 2023, PA 154 and amendments to the Child Care Organization Act, 1973 PA 116 o Required proper installation of the requested water cooler with bottle fillers (LZSTL8WSSP for bi-level. LZS8WSSP for single) o Billing will be accepted upon completion of the scope o No bid security shall be required o Withdrawal of bid will be accepted up to 24 hours after notification of award o All required fees, permits and inspections to meet RFP o No electrical work shall be included in this RFP (owner will be responsible for Electrical work) o Any required stainless steel 'wall panels' shall be the responsibility of the contractor o The contractor shall be responsible for all on site surveys and inspections before ordering equipment (including blocking) o Removal and disposal of any existing water coolers shall be the sole responsibility of the contractor. There shall be no onsite disposal provided by the owner. o All owner safety standards and policies shall be kept the duration of the job Appleview Elementary School 240 E. Spartan Drive Two (2) bi-level water coolers with bottle fillers Ridgeview Elementary School 560 West Spartan Drive One (1) bi-level water cooler with bottle filler Sparta High School 475 West Spartan Drive Ten (10) bi-level water coolers with bottle fillers Three (3) single height water cooler with bottle filler Option #1 Additional five (5) single height water cooler with bottle fillers Early Childhood Center 480 S. State Street Two (2) single height water coolers with bottle fillers
Post-Bid
Educational
$80,000.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 28, 2025
May 28, 2025
Multiple Locations, Sparta, MI
Related To This Project
Sparta, MI
Bid Date: May 28 2025
Sparta, MI
Bid Date: Jun 30 2025
Sparta, MI
Bid Date: Jul 11 2025
Sparta, MI
Bid Date: Aug 07 2025
Sparta, MI
Bid Date: Jul 31 2025
Sparta, MI
Bid Date: Dec 10 2025
Sparta, MI
Bid Date: Feb 06 2026
Sparta, MI
Bid Date: Feb 06 2026
Sparta, MI
Bid Date: Jun 27 2019
Sparta, MI
Bid Date: Apr 03 2025
Sparta, MI
Bid Date: May 13 2025
Sparta, MI
Bid Date: Feb 18 2025
Sparta, MI
Bid Date: Jan 30 2025
Sparta, MI
Bid Date: Jan 30 2025
Sparta, MI
Bid Date: Jan 16 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
