Published May 16, 2025 at 8:00 PM
Updated May 17, 2025
Site work for a civil project in New Bedford, Massachusetts. Completed plans call for site work for a water / sewer project.
The work for the MPS project will consist of, but not limited to, the following Installation of temporary plugs in existing piping to isolate the existing main pump station wet well. Installation of temporary bypass pump and piping. Selective demolition of pumps, guide rails, support brackets, base elbows, and associated hardware. Selective demolition of power and control wire to the existing pumps. Surface preparation and recoating of the existing main pump station wet well interior. Purchase and installation of submersible wastewater pumps, pump base elbows, guide rails, support brackets, lift chains and associated hardware. Purchase and installation of instruments and control panel for wastewater pumps. Purchase and installation of power and control wiring for wastewater pumps. Testing and startup of installed equipment. Removal of temporary plugs and bypass pumping equipment at completion of construction. Main Pump Station Rehabilitation Project The work will consist of, but not limited to, the following: installation of temporary plugs in existing piping to isolate the existing main pump station wet well, and temporary bypass pump and piping; selective demolition of pumps, guide rails, support brackets, base elbows, associated hardware, and power and control wire to the existing pumps; surface preparation and recoating of the existing main pump station wet well interior; purchase and installation of submersible wastewater pumps, pump base elbows, guide rails, support brackets, lift chains, associated hardware, and instruments, control panel, power and control wiring for wastewater pumps; and, testing and startup of installed equipment. Contractor Qualification Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.
Post-Bid
Water / Sewer
$500,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 16, 2025
June 16, 2025
Multiple Locations, New Bedford, MA
Related To This Project
New Bedford, MA
Bid Date: May 28 2025
New Bedford, MA
Bid Date: May 01 2025
New Bedford, MA
Bid Date: May 22 2025
New Bedford, MA
Bid Date: May 22 2025
New Bedford, MA
Bid Date: May 28 2025
New Bedford, MA
--
New Bedford, MA
Bid Date: May 14 2025
New Bedford, MA
Bid Date: May 27 2025
New Bedford, MA
Bid Date: Apr 10 2025
New Bedford, MA
Bid Date: Apr 23 2025
New Bedford, MA
Bid Date: Apr 17 2025
New Bedford, MA
--
New Bedford, MA
Bid Date: Mar 27 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.