Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 7, 2025 at 8:00 PM
Updated August 7, 2025
Site work and paving for a mixed-use development in Ray, North Dakota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
The work generally consists of: 1. Schedule 1: Water Main Extensions a. Base Bid: Open-cut installation of approximately 340 LF of 6-inch water main and 3,635 LF of 8-inch water main including valves, hydrants, fittings, and other associated appurtenances. Horizontal directionally drilled installation of approximately 105 LF of 8-inch water main. Jack and Bored installation of approximately 280 LF of 8-inch water main and 16-inch casing. Surface restoration will include aggregate and grass surfacing. 2. Schedule 2: Sanitary Sewer CIPP Rehabilitation a. Base Bid: Trenchless cured-in-place-pipe (CIPP) rehabilitation of approximately 2,977 LF of 8-inch sanitary sewer main, approximately 46 internally CIPP-sealed service lateral connections, CIPP rehabilitation of approximately 30 existing service laterals from the main to the property line, and installation of 2 sanitary sewer manholes. Open-cut replacement of existing sanitary sewer mains/laterals will be included as necessary. Surface restoration will include asphalt pavement, curb and gutter, and landscaping. b. Qualifications: To demonstrate the Bidder's qualifications to perform the Work, within five (5) calendar days of the OWNER's request, Bidder shall submit written evidence of previous experience in performing municipal trenchless sewer main and sewer service renovation using Cured-In-Place-Pipe methods, previous experience in performing horizontal directionally drilled water mains, and previous experience in performing jack and bore pipe/casing installations. Contract Time: 1. Schedule 1: a. Construction Schedule 1 must be substantially complete and ready for Owner's use and pre-final inspection within ninety (90) calendar days of the date issued in the Notice to Proceed of Schedule 1. Notice to Proceed to be issued no later than 30 days after the fully executed Construction Agreement. 2. Schedule 2: a. Construction Schedule 2 must be substantially complete and ready for Owner's use and pre-final inspection within ninety (90) calendar days of the date issued in the Notice to Proceed of Schedule. 2. Notice to Proceed to be issued no later than 30 days after the fully executed Construction Agreement. 3. Each construction schedule shall be finally complete and ready for final payment within thirty (30) calendar days of substantial completion. 4. The Contractor shall pay the Owner $1,700.00 for each day or part of a day that expires after the time specified for Substantial Completion of any construction schedule until the Work is substantially complete. The maximum amount the Contractor will pay is $1,700.00 per calendar day regardless of the number of construction schedules or alternates that are not substantially complete per the time described above. Question Deadline 04/18/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than five (5) days prior to the date for opening of Bids may not be answered.
Award
Water / Sewer
$2,170,023.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 24, 2025
May 26, 2025
Multiple Locations, Ray, ND
Related To This Project
Ray, ND
Bid Date: Oct 02 2025
Ray, ND
Bid Date: Mar 13 2025
Ray, ND
Bid Date: Oct 11 2024
Ray, ND
Bid Date: May 30 2024
Ray, ND
Bid Date: Apr 25 2024
Ray, ND
Bid Date: Mar 27 2024
Ray, ND
Bid Date: Apr 07 2022
Ray, ND
Bid Date: Feb 08 2024
Ray, ND
Bid Date: Mar 23 2023
Ray, ND
Bid Date: Mar 16 2023
Ray, ND
Bid Date: Apr 04 2022
Ray, ND
Bid Date: Mar 11 2022
Ray, ND
Bid Date: Apr 07 2022
Bismarck, ND
Bid Date: Apr 21 2025
Lakota, ND
Bid Date: Apr 24 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
