BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 9, 2025 at 8:00 PM

Updated May 10, 2025

Renovation of a water / sewer project in Douglas, Wyoming. Completed plans call for the renovation of a water / sewer project.

The City of Douglas Wastewater Treatment Plant Air Headers Replacement Project consists of replacing the aging buried air headers/manifolds with approximately 1900LF 12-inch welded steel pipe with fusion bonded epoxy coating designed for high temperatures. The existing air headers will be abandoned in place and the new air headers will be connected to the existing air valve assemblies with DR17 HDPE pipe. Additionally, the project includes the installation of approximately 3600LF of 2-inch schedule 80 PVC conduit pipe with a pull rope for the future installation for water monitoring equipment including NEMA 4x junction boxes. The project also includes inside mechanical work which primarily consists of installed vortex meters for air flow measurements and air header modifications. The project site has a large stockpile of fill material which can be utilized for the backfill material. Est. Completion Date: Nov. 15, 2025 Question Deadline 04/25/2025 Each Bid must be submitted on the Bid Form, accompanied by Bid security, as prescribed in the Instructions to Bidders, payable to the City of Douglas (OWNER) in an amount not less than five percent (5%) of the amount Bid. The Successful Bidder will be required to furnish the necessary additional Bond(s) for the faithful performance of the Work, as prescribed in the Bidding Documents. OWNER reserves the right to reject any or all Bids

Post-Bid

Water / Sewer

$650,000.00

Public - City

Renovation

14

10

17

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
3
Bidding Soon
72
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2025

June 6, 2025

Project location map

Robin Ln, Douglas, WY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.