BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 31, 2025 at 8:00 PM

Updated November 1, 2025

Demolition, site work and addition to an educational facility in Douglas, Wyoming. Completed plans call for the addition of a 11,552-square-foot, two-story above grade educational facility; for the demolition of a educational facility; and for site work for a educational facility.

Site Directions: EWC Campus at 800 S. Windriver Dr., Douglas, WY 82633 This project is proposed to affect 10,000 square feet of the existing site to accommodate the proposed 8,820 square-foot addition to be located west of the existing Workforce Training Lab. All questions shall be addressed to Arete Design Group, 228 E. Brundage Street, Suite 100, Sheridan, Wyoming 82801, (307) 672-8270, info@aretedesign.group

Award

Educational

$4,774,469.00

Public - County

Addition, Demolition, Site Work

109

26

2

4

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
17
Bidding Soon
116
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2025

October 9, 2025

Project location map

800 S Windriver Dr, Douglas, WY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.