Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 3, 2025 at 8:00 PM
Updated April 4, 2025
Site work and paving for a transportation facility in Birmingham, Alabama. Conceptual plans call for site work for a transportation facility; and for paving for a transportation facility.
Deadline for SOQ Questions/Clarifications March 06, 2025 Recommendation to Award June-July 2025 Goals i. To enter into a contract with the most qualified engineering firm for professional services to perform the scope of work. ii. To provide professional services to design the proposed project in FY 2025. B. Anticipated Project Elements The anticipated project element necessary phases to successfully execute the proposed project are listed below. These are subject to change based on actual project needs determination. Preliminary Phase: This phase involves those activities required for defining the scope of a project and establishing preliminary requirements. Some examples of activities within this phase of a project include, but are not limited to: i. Coordinating with the sponsor on project scope requirements, finances, schedules, operational safety and phasing considerations, site access and other pertinent matters. ii. As applicable, coordinating project with local FAA personnel and other interested stakeholders to identify potential impacts to their operations. iii. Planning, procuring, and/or preparing necessary surveys, geotechnical, engineering investigations, field investigations, and architectural and engineering studies required for design considerations. iv. Developing design schematics, sketches, environmental and aesthetic considerations, project recommendations, and preliminary layouts and cost estimates. Design Phase: This phase includes all activities required to undertake and accomplish a full and complete project design. Examples include, but are not limited to, those below: i. Conducting and attending meetings and design conferences to obtain information and to coordinate or resolve design matters. ii. Collecting engineering data and undertaking field investigations; performing geotechnical engineering studies; and performing architectural, engineering, and special environmental studies. iii. Preparing necessary engineering reports and recommendations. iv. Preparing detailed plans, specifications, cost estimates, and design/construction schedules. v. Preparing Construction Safety and Phasing Plan (CSPP). vi. Printing and providing necessary copies of engineering drawings and contract specifications. Bidding and Negotiation Phase: These activities are sometimes considered part of the construction phase. They involve assisting the sponsor in advertising and securing bids, negotiating for services, analyzing bid results, furnishing recommendations on the award of contracts, and preparing contract documents.
Conceptual
Transportation Terminals
$300,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 13, 2026
5900 Messer Airport Hwy, Birmingham, AL
Related To This Project
Birmingham, AL
--
Birmingham, AL
Bid Date: Apr 04 2025
Birmingham, AL
Bid Date: May 08 2025
Birmingham, AL
Bid Date: May 27 2025
Birmingham, AL
Bid Date: Apr 08 2025
Birmingham, AL
Bid Date: May 01 2025
Birmingham, AL
Bid Date: Apr 24 2025
Birmingham, AL
Bid Date: Jun 12 2025
Birmingham, AL
--
Birmingham, AL
--
Birmingham, AL
Bid Date: Apr 15 2025
Birmingham, AL
Bid Date: Apr 17 2025
Birmingham, AL
Bid Date: Apr 22 2025
Birmingham, AL
Bid Date: Apr 25 2025
Birmingham, AL
Bid Date: Apr 16 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
