BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 3, 2025 at 8:00 PM

Updated April 4, 2025

Site work and paving for a transportation facility in Birmingham, Alabama. Conceptual plans call for site work for a transportation facility; and for paving for a transportation facility.

Deadline for SOQ Questions/Clarifications March 06, 2025 Recommendation to Award June-July 2025 Goals i. To enter into a contract with the most qualified engineering firm for professional services to perform the scope of work. ii. To provide professional services to design the proposed project in FY 2025. B. Anticipated Project Elements The anticipated project element necessary phases to successfully execute the proposed project are listed below. These are subject to change based on actual project needs determination. Preliminary Phase: This phase involves those activities required for defining the scope of a project and establishing preliminary requirements. Some examples of activities within this phase of a project include, but are not limited to: i. Coordinating with the sponsor on project scope requirements, finances, schedules, operational safety and phasing considerations, site access and other pertinent matters. ii. As applicable, coordinating project with local FAA personnel and other interested stakeholders to identify potential impacts to their operations. iii. Planning, procuring, and/or preparing necessary surveys, geotechnical, engineering investigations, field investigations, and architectural and engineering studies required for design considerations. iv. Developing design schematics, sketches, environmental and aesthetic considerations, project recommendations, and preliminary layouts and cost estimates. Design Phase: This phase includes all activities required to undertake and accomplish a full and complete project design. Examples include, but are not limited to, those below: i. Conducting and attending meetings and design conferences to obtain information and to coordinate or resolve design matters. ii. Collecting engineering data and undertaking field investigations; performing geotechnical engineering studies; and performing architectural, engineering, and special environmental studies. iii. Preparing necessary engineering reports and recommendations. iv. Preparing detailed plans, specifications, cost estimates, and design/construction schedules. v. Preparing Construction Safety and Phasing Plan (CSPP). vi. Printing and providing necessary copies of engineering drawings and contract specifications. Bidding and Negotiation Phase: These activities are sometimes considered part of the construction phase. They involve assisting the sponsor in advertising and securing bids, negotiating for services, analyzing bid results, furnishing recommendations on the award of contracts, and preparing contract documents.

Conceptual

Transportation Terminals

$300,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
59
Bidding Soon
919
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2026

Project location map

5900 Messer Airport Hwy, Birmingham, AL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.