EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 5, 2025 at 8:00 PM

Updated April 6, 2025

Site work and new construction of a military facility in Winnipeg, Manitoba. Working plans call for the construction of a two-story above grade military facility; and for site work for a military facility.

Design and Construction of a future Aircrew Training (FAcT) Program infrastructure at CFB Winnipeg (17 Wing). The infrastructure will support training of personnel, as well as storage and maintenance of aircraft. Scope of work includes new hangar block which is a two-storey section of non-combustible construction to house the storage and maintenance of multiple aircraft, with associated program spaces, to include supply storage and warehouse, workshops, vehicle storage, offices, meeting rooms, and staff support functions. The provision of second level mechanical mezzanines, size, and locations to be determined in detailed design phase. Based on the size of the mechanical mezzanines and second floor office space, the building is presumed to be classified as a two-storey building. A new training block which is a two-storey section of non-combustible construction to house the training solution (i.e., training classrooms, simulator rooms, briefing rooms, offices, meeting rooms and staff support functions). The provision of rooftop mechanical platforms, size, and locations to be determined in the detailed design phase. The building may be classified as a three-storey, based on the size of the mechanical platforms. Note that the above description of the scope of work is not final and is subject to change. TIMELINE: Project is in development and construction is conditional on the project receiving approval to proceed from the Government of Canada. An Advanced Procurement Noitce (APN) has been issued by the Design Builder - EllisDon Corporation (EllisDon) to notify interested trade contractors, vendors and suppliers of its intention of upcoming procurement opportunities. Further project details and construction schedules may be confirmed mid-/fall 2025. *Construction cost is unreleased.

Pre-Construction/Negotiated

Military

$100,000,000.00

Public - Federal

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
29
Bidding Soon
309
All Active Projects
155
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 31, 2026

img_map_placeholder

715 Wihuri Rd, Winnipeg, MB

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.