BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 15, 2025 at 8:00 PM

Updated May 16, 2025

Renovation of a water / sewer project in Winnipeg, Manitoba. Completed plans call for the renovation of a water / sewer project.

The Work to be done under the Contract shall consist of the demolition of existing boilers B5, B5A, B5B and supply, installation, testing and commissioning of two (2) new boilers and associated systems in the existing Boiler 5 room at North End Sewage Treatment Plant (also known as NEWPCC). In addition, the Work includes the replacement of the existing MCCs and associated work as noted on the electrical drawings. The major components of the Work are as follows: (a) Supply and install two (2) new fire tube boilers, BLR-B0005 and BLR-B0006, c/w accessories and chimneys. Related works include: (i) New penetrations in existing roof to accommodate the new chimneys. (ii) Repair and seal around existing wall penetrations. (iii) Provide permanent post supports in basement room beneath new boilers to reinforce floor against the weight of the new boilers. (b) Demolish and remove boiler B5 and associated chimney, piping, electrical, controls, etc. Provide temporary cover for the chimney roof penetration as required. (c) Relocate existing nitrogen tanks. (d) Remove boilers B-5A, and B-5B with associated pumps. (e) Relocate low-flow circulating pump P-B0150 (Previous tag BP-5D.) (f) Supply and install new boiler hot water piping, consisting of: (i) New supply and return lines from the new boilers to the new pumps including tie-ins to existing hot water supply/return piping. A hot tap specialist is required to for the tie-ins to existing piping. (ii) Revise piping serving existing boiler BLR-B0007 (Previous tag B-5C.) (g) Supply and install new boilers natural gas piping, consisting of: (i) Upsize natural gas line from 80mm to 100mm to feed new boilers BLR-B0005 and BLR-B0006 as well as existing boiler BLR-B0007. (ii) Provide new pressure-reducing regulator at each new boiler, and run pressure relief lines from regulators to outdoors, repair and seal around new wall/roof penetrations. (h) Supply and install new boiler water relief piping, consisting of: (i) Safety relief separator tank and associated piping and venting. Repurpose old chimney roof penetration for the separator tank vent. (ii) Run new safety relief valve separator tank into existing main boiler room, and tie-in to existing blowdown tank drain. (i) Remove obsolete hot water and natural gas piping around existing Boiler 5 as required to accommodate new piping tie-ins. (j) Supply and install two (2) new funnel drains near new boilers, and new drainage piping to existing sump pit in existing main boiler room. (k) Provide modifications to existing boiler plant control system to integrate control of new boilers into the existing system. (l) Provide testing and commissioning of the new boilers. D3.3 The City is awaiting ITS permission/approval to connect new boilers to the digester gas system (Expected by December 31, 2025). The following Work to be priced under lines 2 and 3 of Form B - Prices. The Work shall not be carried out until written permission is give by the Contract Administrator on or before December 31, 2025. (a) Separate Price Item 1 - Installation of Boilers BLR-B0005 and BLR-B0006 Digester Gas Service (i) Install new 100Ø mm. digester gas header in the Boiler 5 room. Tie-in new header to the existing digester gas system isolation valve. (ii) From the new 100Ø mm. digester gas header, install separate 80Ø mm. digester gas service piping connections to new boilers 5 and 6 digester gas valve trains. Provide new dedicated isolation valve for each boiler service connection. (iii) Install one new dedicated flowmeter, with associated power and control wiring, on each boiler 5 and 6 digester gas service piping connection. (iv) Install new digester gas condensate drain piping for each boiler 5 and 6 digester gas valve train. Condensate drain connection locations to the boiler digester gas valve trains shall be coordinated with the boiler vendor. Route condensate piping through the Boiler 5 room basement to new high and low pressure digester gas condensate traps in the main boiler room. (v) Install new high pressure and low pressure digester gas condensate traps in the main boiler room, dedicated to boilers 5 and 6. Route condensate trap venting to outdoors. (vi) Demolish existing low pressure condensate drip trap, connected to the digester gas header, in the main boiler room and replace with new high pressure digester gas condensate trap. Route trap venting to outdoors. (b) Separate Price Item 2 - Boiler 1 and 2 Digester Gas Safety Shutoff Valve Replacement (i) The following scope of work applies to both existing boilers 1 and 2 digester gas valve trains. (ii) Demolish and replace the existing digester piping with new, from the dedicated boiler isolation valve, downstream to the existing flame arrester. The existing boiler isolation valve and flame arrester shall remain. (iii) Demolish and remove existing boiler low pressure digester gas condensate traps. (iv) Install new digester gas strainer. (v) Install new digester gas pressure regulator. (vi) Install new digester gas pressure relief valve. Route relief valve venting to outdoors. (vii) Install new digester gas differential pressure flowmeter, complete with new tapped flanges and orifice plate. Connect new flowmeter to existing flow transmitter. Existing flow transmitter and associated control and power wiring shall be retained for reuse. (viii) Demolish and remove existing digester gas safety shutoff valves. Retain existing power and control wiring for reuse. Install two (2) new flanged digester gas safety shutoff valves. Reconnect existing power and control wiring to the new valves once they are installed. (ix) Demolish and remove existing digester gas automatic vent valve, with associated vent piping. Retain existing valve power and control wiring for reuse. Install one (1) new automatic vent valve. Install and route new vent piping to atmosphere. (x) Install new piping connections and bleed vents for existing low pressure switch and high pressure switch. Existing low pressure and high pressure switches, with associated wiring, shall be retained for reuse. (xi) Install new high pressure digester gas condensate drip trap, connected to new strainer blowdown port. Route trap venting to outdoors. (xii) Install new portable low pressure digester gas condensate drip trap at low point of digester gas valve train. (xiii) Install new portable low pressure digester gas condensate drip trap, connected to the existing flame arrester. (xiv) Install new digester gas ancillary accessories including pressure indicators, pressure test points and purge points. (xv) Commission and verify performance of new digester gas valve train and associated systems, including new safety shutoff valves, automatic vent valve, flowmeter and existing transmitter, pressure regulator, relief valve and existing high pressure and low pressure switches. The Bidder shall include in their Bid Submission bid security in the form of a digital bid bond, in the amount of at least ten percent (10%) of the Total Bid Price, and agreement to bond of a company registered to conduct the business of a surety in Manitoba, in Form G1: Bid Bond and Agreement to Bond, available at Form G1 Bid Bond & Agreement to Bond. (a) a performance bond of a company registered to conduct the business of a surety in Manitoba, in the amount of fifty percent (50%) of the Contract Price; and (b) labour and material payment bond of a company registered to conduct the business of a surety in Manitoba, in an amount equal to fifty percent (50%) of the Contract Price. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Bid Results

Water / Sewer

$4,040,329.00

Public - City

Renovation

103

50

14

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
177
Active Projects
97
Bidding Soon
573
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2025

June 9, 2025

Project location map

2230 Main St, Winnipeg, MB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.