BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 6, 2025 at 8:00 PM

Updated May 9, 2025

Renovation of a mixed-use development in Essex Junction, Vermont. Completed plans call for the renovation of a educational facility.

The Essex Westford School District is seeking bids for the roof replacement at Thomas Fleming School. Architectural Work: 1. General Scope: Replace existing slate roofing and trims with new fiberglass asphalt singles on underlayment and associated trims. Provide all labor and materials necessary to furnish a complete and functional, weathertight product. 2. Architectural Work shown herein has been designed and stamped by a Licensed VT Architect. 3. All fabrication and installation work shall comply with the current editions of the VT Fire and Building Safety Code, current edition (2015).

Post-Bid

Educational

$200,000.00

Public - City

Renovation

5

8

2

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
374
Active Projects
209
Bidding Soon
2,202
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2025

June 16, 2025

Project location map

21 Prospect St, Essex Junction, VT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.