BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 28, 2025 at 8:00 PM

Updated May 29, 2025

Site work and paving for a road / highway in Milwaukee, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

ST216250105 The bidders commitment for Resident Preference Program Participation on the project is 40 % Any questions regarding the design of the lighting system are to be directed to Street Lighting Engineering. Contact Mr. Eng-Kie Lee at (414) 286-2174. The contractor shall schedule milling, paving and associated work to complete work by the dates above. Prior to beginning work at each location under this contract, the contractor shall provide five (5) working days-notice to the construction project supervisor, Paul Keltner (414) 708-2893 Construction of Variable Thickness Asphalthic Concrete Pavement, Pavement Grinding, Plastic Pavement Marking, Manhole\inlet Adjustments, Cuc Adjustments, Etc.; Located at: St216250105 The "High Impact" asphalt paving project locations are as follows: North 33rd Street - West McKinley Boulevard to West Vliet Street North 37th Street - West Locust Street to West Fond du Lac Avenue North 51st Street - West North Avenue to West Lisbon Avenue North 53rd Street - West Lisbon Avenue to West Burleigh Street South 57th Street - West Morgan Avenue to West Oklahoma Avenue North 58th Street - West McKinley Avenue to West Washington Boulevard (skip West Vliet Street to West Galena Street) North 60th Street - West Fairview Avenue to West Bluemound Road South 64th Street - West Dickinson Street to West Fairview Avenue South 85th Street - West Holt Avenue to West Euclid Avenue South 86th Street - West Morgan Avenue to West Euclid Avenue West Clarke Street - North 40th Street to North Sherman Boulevard West Dakota Street - South 49th Street to South 51st Street West Dickinson Street - South 68th Street to South 70th Street West Holt Avenue - South 79th Street to South 80th Street West Park Hill Avenue - North 90th Street to North 91st Street West Spaulding Pl. - North 42nd Street to North Sherman Boulevard West Stack Dr. - South 55th Street to South 60th Street South Tennessee Avenue - West Van Norman Avenue to Louisiana Avenue West Townsend Street - North 84th Street to North 92nd Street Time for Completion: All work on this contract shall be completed by November 26, 2025. Liquidated Damages, per diem: $1000.00/Day The SBE requirement for this project is 15% of the contract base bid. Bid Security Required: Bond, Certified Check, Cashier's Check or Cash to accompany bid: 10% of the Contractor's Base Bid.

Award

Roads / Highways

$987,947.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
313
Active Projects
185
Bidding Soon
1,947
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2025

May 16, 2025

Project location map

Multiple Locations, Milwaukee, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.