Site work for a civil project in Marion, Iowa. Completed plans call for site work for a road / highway; and water / sewer project.

The general nature of the work on which bids are requested is: 70 LF of 6" Subdrain, 2 EA Subdrain Cleanouts,1 LS Traffic Signal, 1 LS Traffic Control, and miscellaneous related work and appurtenances in accordance with the contract documents. Doc Note - The plans and specifications are now on file in the office of the City Clerk. Copies thereof may be obtained at the office of the Public Works Department - Engineering Division. One set of bidding documents for the above project is available without charge to prospective bidders, i.e. qualified general contractors and subcontractors. A $20.00 fee will apply to additional sets and to bidding documents requested by other than prospective bidders as defined herein. A fee for shipping will also be included and is due prior to shipping. The City of Marion Public Works Department - Engineering Division is the only authorized source of bidding documents and proposal forms. Bidding documents and proposal forms obtained from any other source may have an incomplete set of documents. Bidders using bidding documents and/or proposal forms not obtained from the City of Marion Public Works Department - Engineering Division are advised to contact the City of Marion Public Works Department - Engineering Division to provide a contact name, mailing address and phone number to enable receipt of necessary addenda. Reproduction of these documents without the express permission of the City of Marion is prohibited. For plans contact: Jenni Stark Project Assistant 319.743.6340 istark@citvofmarion.org For project questions contact: Jacob Hahn, PE Deputy City Engineer 319.743.6340 ihahn@citvofmarion.org 10% bid bond Work shall be completed by October 17, 2025. Liquidated damages in the amount of $500.00 per calendar day will be assessed for work not completed within this time. A disincentive of $50 per minute shall be assessed for each minute the traffic signal remains de-energized past the initial 2 hours. Each bidder shall accompany its bid with bid security as defined in Code of Iowa Section 26.8 and as specified in the Instructions to Bidders. The bid security is to be placed in a separate envelope attached to the envelope containing the bid. Each successful bidder shall be required to furnish a corporate surety bond in an amount equal to one hundred percent (100%) of its contract price. Said bond to be issued by a responsible surety approved by the City Council and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment of all material and labor and protect and save harmless the City from claims and damages of any kind caused by the operations of the contract. Upon completion of the project and before final acceptance by the City Council, the contractor will be required to post a maintenance bond (2-year for sewer or 4-year for paving) or be required to pay the City 1.5 percent of the final contract amount to pay for the applicable maintenance bond. Such 1.5 percent shall not be refundable to the contractor and the City will act as the bonding agent. Posting of the maintenance bond or the cash payment will be the election of the City Engineer, all in accordance with Ordinance 77-21 of the City of Marion. The City of Marion reserves the right to defer acceptance of any bid for a period not to exceed thirty (30) days after receipt of bids, and no bid may be withdrawn during this period. Scope of Work 1.09 CHANGED SITE CONDITIONS B. Compensation Add the following: “3. Under no circumstances will payment for down time be made by the City of Marion as project field issues are being resolved. The City of Marion will take all necessary action to resolve issues in a timely manner.” 1.10 DISPUTED CLAIMS FOR EXTRA COMPENSATION A. Basis of Claim for Extra Compensation Add the following: “6. Under no circumstances will payment for down time be made by the City of Marion as project field issues are being resolved. The City of Marion will take all necessary action to resolve issues in a timely manner.” 1.11 DELAYS CAUSED BY THE JURISDICTION Add the following: “Under no circumstances will payment for down time be made by the City of Marion as project field issues are being resolved. The City of Marion will take all necessary action to resolve issues in a timely manner.”

Bid Results

Roads / Highways

$140,640.00

Public - City

Site Work

11

10

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
95
Bidding Soon
1,121
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2025

May 22, 2025

Project location map

US-151 & IA-13, Marion, IA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.