Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2025 at 8:00 PM

Updated May 15, 2025

Site work for a water / sewer project in Shorewood, Wisconsin. Completed plans call for site work for a water / sewer project.

The Project includes the following Work: 232 private lead service replacements and 283 public lead service line replacements. The Bid must be accompanied by Bid security made payable to OWNER in an amount of 5% of the Bidder's maximum Bid price. OWNER reserves the right to reject any or all Bids, to waive any technicality, and to accept any Bid which it deems advantageous. All Bids shall remain subject to acceptance for 85 days after the time set for receiving Bids. Contract award shall be made based on the lowest responsive and responsible Bidder. Any Contract or Contracts to be awarded are expected to be funded with assistance from the Wisconsin Department of Natural Resources Safe Drinking Water Loan Program and is subject to all applicable State and Federal laws and regulations. Disadvantaged Business Enterprises (DBEs), including Women's and Minority owned businesses, are encouraged to submit Bids for this Project. Bidders must demonstrate positive efforts to utilize DBEs. Failure to comply could result in disqualification of Bidder and termination of financial assistance or other sanctions. The successful Bidder will be required to conform to the wage requirements prescribed by the federal Davis-Bacon and Related Acts. The Strand Associates, Inc project manager is Nicole L. Wellenstein, P.E. and can be contacted at Strand Associates, Inc.(R), 126 North Jefferson Street, Suite 350, Milwaukee, WI 53202, (414) 271-0771, regarding the Project. For further requirements regarding Bid submittal, qualifications, procedures, and Contract Award, refer to the Instructions to Bidders that are included in the Bidding Documents. All iron, steel, manufactured products, and construction materials shall also be produced in the United States and comply with the Build America, Buy America Act requirements. Bidders shall comply with President's Executive Order 11246, Equal Employment Opportunity as amended.

Award

Water / Sewer

$2,174,514.00

Public - City

Site Work

14

10

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
285
Active Projects
142
Bidding Soon
2,243
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2025

May 16, 2025

Project location map

Multiple Locations, Shorewood, WI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed