Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 7, 2025 at 8:00 PM
Updated May 8, 2025
Demolition, site work, renovation and addition to a mixed-use development in Evergreen, Colorado. Completed plans call for the addition of a swimming pool; for the demolition of a swimming pool; for site work for a swimming pool; and for the renovation of a swimming pool.
Reference Number 0000382621 Job Location: Evergreen, Colorado Evergreen Park & Recreation District is seeking an experienced firm to perform CM/GC Services to support the design and construction of an Aquatics Expansion to Buchanan Park Recreation Center in Evergreen, Colorado. Question Deadline 04/24/2025 at 5:00 PM MT Questions are submitted online No, For questions regarding this Request for Qualifications, please contact Bob Schmitz, bschmitz@eprdco.gov or 720-880-1113. 6/9/2025 Begin Work The construction project shall be designed to meet available funding. The current anticipated budget for the entire project, including planning & design services, construction and construction management services, and permitting costs, is $8,000,000-$10,000,000. Proposals containing creative cost-saving methods and value-engineering concepts, for both the design phase and project construction, will be viewed favorably. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The General Contractor’s scope of work will generally consist of the following: A.) General • Coordinate and collaborate with EPRD and EV Studio from pre-construction through project completion; • Regularly attend in person Owner and Design Team meetings during all phases of design and construction. In person attendance and teams may be requested for various meetings, and in-person attendance is expected if requested; • Prepare a comprehensive list of deliverables and submittals with scheduled submission dates for the preconstruction and construction phases; • Promote the use of local labor and resources at all available opportunities, within budget constraints, and as permitted by law and EPRD policy; • Place EPRD’s and the community’s interests at the top of the project priorities; and • Work with EPRD and EV Studio, as required, to resolve issues that may arise.
Post-Bid
Swimming Pools
$10,000,000.00
Public - City
Addition, Demolition, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 5, 2025
June 9, 2025
32003 Ellingwood Trail, Evergreen, CO
Related To This Project
Evergreen, CO
--
Evergreen, CO
--
Evergreen, CO
Bid Date: May 16 2025
Evergreen, CO
Bid Date: May 22 2025
Evergreen, CO
Bid Date: May 20 2025
Evergreen, CO
Bid Date: Jun 24 2025
Evergreen, CO
Bid Date: Sep 19 2025
Evergreen, CO
Bid Date: Apr 17 2025
Evergreen, CO
Bid Date: Apr 10 2025
Evergreen, CO
Bid Date: Mar 04 2025
Evergreen, CO
Bid Date: Feb 20 2025
Evergreen, CO
Bid Date: Mar 04 2025
Evergreen, CO
Bid Date: Jan 10 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
