Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 1, 2025 at 8:00 PM
Updated July 2, 2025
Site work, paving, outdoor lighting and renovation of a mixed-use development in Sacaton, Arizona. Completed plans call for site work for a water / sewer project; playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and for outdoor lighting for a sidewalk / parking lot.
**As of July 01, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** The Gila River Indian community is seeking Construction services from a General Contractor for the Construction and Renovation of the District Two (2) Hashan Kehk Ball Park. There will be construction and civil improvements to existing site. Construction shall include, but is not limited to, the site development to update current onsite facilities and the following: o Modify and refurbish the existing baseball field with new grass and irrigation system; o Renovate existing bathroom facilities; o Renovate convenient/concession stand w/food prep area and ice machine; o New parking lot with drop-off area; o New playground with shade canopy; o New skate park; o New basketball courts; o New volleyball court; o New 16x16 park ramadas with grills and water faucets; o New fire lane; o New 20'x30'park maintenance and storage buildings; o New story telling area; o New bar-b-que area with serving counter, hand washing area, and fans; o Drinking faucets throughout park; o New 20'x40'metal storage building for big ramada with storage area; o New 120'x60'big ramada (metal) with water faucets, stage and ceiling fans; o Two 20'x30' ramadas with grills and water faucets; o New walking trail around the park; o Sidewalks throughout park including sidewalk connected to service center parking lot; o Site and parking lot lighting; o Security fence (wrought iron) around the park including pedestrian and vehicle access gates; o Trash enclosure space; o Drainage improvements; and o Landscape throughout the park. Question Deadline 04/21/2025 at 4:00 PM MT Deadline to submit Questions Online. Deadline for Written Responses: Thursday, April 24, 2025 @ 5:00am All public and access areas to meet minimum ADA regulations and compliance. These improvements will include a new paved parking lot for better ADA maneuverability, ADA compliant sidewalks in lieu of gravel, and some civil grading and drainage improvements to control the flooding issues on the existing ball fields. The General Contractor will be expected to work closely with Tribal Projects staff and the design team during construction of this project. The selected contractor will be expected to begin construction within 10 days upon receiving a Notice to Proceed and complete all project work within one hundred eighty days (180). The contract will be awarded to the successful construction firm whose proposal, conforms to the RFP, and is most advantageous to the Community. The Community reserves the right to reject any and all proposals and to waive informalities and irregularities in proposals received and to accept any portion of any proposal or all items proposed if deemed in the best interest of the Community.
Post-Bid
Playgrounds / Parks / Athletic Fields
$300,000.00
Public - Federal
Outdoor Lighting, Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 20, 2025
June 19, 2025
8070 Park St, Sacaton, AZ
Related To This Project
Sacaton, AZ
Bid Date: May 21 2025
Sacaton, AZ
Bid Date: Jun 06 2025
Sacaton, AZ
Bid Date: May 20 2025
Sacaton, AZ
Bid Date: Jul 18 2025
Sacaton, AZ
Bid Date: Aug 11 2025
Sacaton, AZ
Bid Date: Feb 05 2025
Sacaton, AZ
Bid Date: Aug 30 2024
Sacaton, AZ
Bid Date: Jun 21 2024
Sacaton, AZ
Bid Date: Jun 30 2020
Sacaton, AZ
Bid Date: Sep 18 2020
Sacaton, AZ
Bid Date: Dec 17 2021
Sacaton, AZ
Bid Date: Sep 15 2023
Sacaton, AZ
Bid Date: May 12 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
