Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 11, 2025 at 8:00 PM
Updated April 29, 2025
Renovation of a residential development in New York, New York. Completed plans call for the renovation of a residential development.
DESCRIPTION: This project is to install a new Mitsubishi ductless air conditioning system on the first floor of Building 51 and install a new conventional DX air conditioning system for the second floor. Building 51 is located at 1150 Forest Hill Road, Staten Island NY 10314. The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 30 days of award, unless modified below. This is a NYS Public Works project and prevailing wages are to be paid. Refer to attached specification for the following scope of work. Site must be cleaned and all materials secured at the end of each work day. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of the new A/C installation and, before removal of equipment and scaffolding, the contractor is to schedule a quality control and quality assurance inspection with the Plant Superintendent. SCOPE OF WORK includes, but is not necessarily limited to the following: 1. Install Mitsubishi ductless mini split A/C systems on the first floor of Building 51 to adequately cool that area and to provide emergency heating if required. 2. Listed below are the minimum equipment needed to cool and heat the 1 st floor: a. 30,000 BTU. 3 port condensing unit, model # MXZ-3C-30NAHZ4 b. 18,000 BTU , 2 port condensing unit model # MXZ-2C-20NA4 c. Five (5) 9,000 Btu. Air handler, model # MFZ-FS09NA, one each to be placed in the Office, Kitchen, TV room, Dining Room and Bedroom. 3. Install a copper refrigerant line-set for each system from the indoor unit to the outdoor condenser 4. The outdoor condensing unit shall be installed in an approved location, allowing for ease of maintenance 5. Install a new drain line for each system to an approved location. Some systems may require a condensate pump 6. All refrigerant lines shall be installed and routed in a manner that they are out of sight. Unless it is impractical 7. All electrical work that is necessary to complete the project shall be performed by a licensed electrician Facility: Staten Island Developmental Disabilities Service Operating Office (SIDDSOO) Project Site Address: 1150 Forest Hill Road Staten Island NY 10314 - Bldg. 51 Point of Contact: Lenward Holness, 930 Willowbrook Rd., S.I., NY 10314, Building 11J. Contact Phone Number: Office - (718) 983-5342. Mobile - (347) 850-5112. Project Title: Building 51 New A/C Installation. Summary of Work: Install a new ductless system and a central A/C system in Building 51. Page 2 of 3 8. Aesthetics are very important in this project, and therefore all installation must be done with this in mind 9. The second (2nd) floor shall be heated and cooled using a Carrier Air Handler 36,000 Btu. Model # FV4CN B005 - multi speed fan coil and Carrier Condensing Unit (Heat Pump) 36,000 Btu. Model # 25HNB6-36 or equivalent models. These shall replace the existing units along with new refrigerant line sets. All the necessary connections are to be made to the existing ductwork to ensure proper operation. 10. The Air Handler shall be installed in the attic, and the Heat Pump installed in an approved location, allowing for ease of maintenance 11. The thermostats supplied must have the ability to be connected for cooling and heat pump operation 12. All electrical work necessary to complete this project shall be performed by a licensed electrician Any vendor questions not asked during the site visit must be submitted in writing to: Brooklyn.CMM.Bids@opwdd.ny.gov (within two business days of the site visit: April 21, 2025). Both questions and answers (if any) will be provided to all who attend the site visit via email by: April 23, 2025.
Post-Bid
Residential Subdivision
$1,650,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 28, 2025
June 27, 2025
1150 Forest Hill Rd, New York, NY
Related To This Project
New York, NY
Bid Date: Apr 25 2025
New York, NY
--
New York, NY
--
New York, NY
Bid Date: Jun 05 2025
New York, NY
--
New York, NY
Bid Date: Jun 11 2025
New York, NY
--
New York, NY
--
New York, NY
Bid Date: May 22 2025
New York, NY
Bid Date: Apr 30 2025
New York, NY
Bid Date: Apr 24 2025
New York, NY
Bid Date: Apr 07 2021
New York, NY
Bid Date: Apr 29 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
