BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 1, 2025 at 8:00 PM

Updated July 2, 2025

Site work, paving and outdoor lighting for a mixed-use development in New York, New York. Completed plans call for site work for a bridge / tunnel; parking garage; road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The work includes but is not limited to Tunnel Plaza Reconfiguration to improve traffic safety and operations at Manhattan Plaza including installation of new attenuators. Replace electrical and communications roadway duct bank system. Miscellaneous Manhattan Plaza Retaining wall repairs. Miscellaneous West Street Underpass Retaining wall repairs. Miscellaneous Structural repairs in Cellular Structure. Replace the Lighting System in Cellular Structure. Replace the Over height Detection System (OVDS) sensors in the Manhattan Plaza. Replace Greenwich and Washington Street lifts for the Morris Street. Pedestrian Overpass and regrade sidewalk area. Replace Manhattan Plaza Roadway Lighting. Resurface and restripe Manhattan Plaza roadway. Rehabilitate Concrete Toll Zone Pavement. Restripe West Street Underpass. Replace portal trench drains at all four portals at the Manhattan and Brooklyn Plazas Repair concrete deficiencies at the underside of the Battery Parking Garage (BPG) over the Manhattan Plaza. Replace drainage pipe and hanger system at the underside of the Battery Parking Garage (BPG) over the Manhattan Plaza and JP Ward Street. Repair Morris Street Pedestrian Bridge joint cover. Construct flood equipment storage enclosure. Demo West Street Access booth and install access hatch. Replace all manhole lids in Manhattan Plaza. Replace Curb ramps and light pole on Washington Street. Replace Manhattan Plaza Fire Standpipe System. Install new gutter cleanout and trash rack in the Brooklyn Plaza east sidewalk. Mill, pave, restripe, and install new delineators for the full length of the East and West tubes. Goals: 15% MBE; 15% WBE; 6% SDVOB Est $ Value: $10M - $50M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Contract Term: 549 Calendar Days For More Information, Please Contact: Procurement Representative: Carol Berlingieri Email: Carol.berlingieri@mtacd.Org Current addenda: 1

Bid Results

Roads / Highways

$38,337,095.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

69 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,033
Active Projects
568
Bidding Soon
7,728
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2025

August 11, 2025

Project location map

Multiple Locations, New York, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.