Published May 9, 2025 at 8:00 PM

Updated May 10, 2025

Site work for a water / sewer project in Youngstown, Ohio. Completed plans call for site work for a water / sewer project.

Sewer Replacement project that involves abandonment and removal of an existing interceptor sewer. Substantial Completion 150 calendar days Final Completion 200 calendar days The current negotiated goals for construction related activities are 1.2% of all contracts to MBE's and 1.8% of all contracts to WBE's. West-Division Interceptor Sewer Replacement Project - Phase 2 a. Installation and acceptance of new sewer facilities commencing at Bridge Street and terminating near Division Street , offset to the east and generally following the path of the Mahoning River, including, but not limited to the following: 1) 6,079 lineal feet of 48-inch combined sewer and tenty-two, 6-foot diameter manholes. 2) Associated lateral connections. b. Removal of approximately 5,964 lineal feet of 30-inch combined sewer, c. The abandonment of 30-inch sized sewer, including plug and grout installation at locations indicated on the Drawings. d. Abandonment of one (1) manhole. e. Removal of twenty five (25) manholes. f. Earth clearing and grubbing including tree removal. 1) Approximately 0.55 Acres of the project's proposed clearing and grubbing quantity has had tree topping performed. The Contractor is responsible for clearing and hauling these topped trees offsite. g. Asphalt and Concrete Pavement removal and replacement including roadway linear grading placing new aggregate base course, 10-inch reinforced concrete pavement, subgrade compaction and proof rolling. h. An aggressive support and dewatering system will be required since the sewer sits adjacent to the Mahoning River. The sewer installation will require preparation of a dry and stable excavation. i. An extensive bypass pumping plan will be required for the proposed improvements as high-volume wet weather flows are conveyed through the interceptor being replaced that will need to be bypassed to a downstream location within the City's sewer system. The system shall be fully operational, 24-hours a day, for the duration of the Project as needed for the improvements being performed. 1) Phase 1 of the West-Division Sewer Replacement Project may be under construction concurrently with Phase 2. Contractor shall coordinate bypass tie-in location and pump flow rates with Phase 1 contractor prior to setup. j. Removal and replacement of existing storm sewer pipe and structures. k. Additional site restoration including placement of erosion control blankets, top soil, seeding and mulching, and re-grading of existing drainage swales and features. l. The removal and disposal of contaminated soils and water as encountered throughout the project in accordance with all local, state and federal regulations. m. Contractor shall coordinate timing and execution with City Concrete for all construction activities that are on City Concrete's property or require use and access of City Concrete's property. Contractor shall provide a minimum of 3 weeks notice to City Concrete prior to accessing the City Concrete property, and shall not impede the operations at the site. Question Deadline 05/06/2025 All questions about the meaning or intent of the Bidding Documents shall be submitted to Engineer in writing. for receipt not later than three days prior to the date for the opening of Bids.

Bid Results

Water / Sewer

$4,529,354.00

Public - City

Site Work

43

24

6

7

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
280
Active Projects
134
Bidding Soon
2,300
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2025

June 9, 2025

Project location map

West Dr, Youngstown, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.