EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 18, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Youngstown, Ohio. Completed plans call for site work for a water / sewer project.

Sewer Replacement project that involves abandonment and removal of an existing interceptor sewer. Substantial Completion 150 calendar days Final Completion 200 calendar days The current negotiated goals for construction related activities are 1.2% of all contracts to MBE's and 1.8% of all contracts to WBE's. West-Division Interceptor Sewer Replacement Project - Phase 2 a. Installation and acceptance of new sewer facilities commencing at Bridge Street and terminating near Division Street , offset to the east and generally following the path of the Mahoning River, including, but not limited to the following: 1) 6,079 lineal feet of 48-inch combined sewer and tenty-two, 6-foot diameter manholes. 2) Associated lateral connections. b. Removal of approximately 5,964 lineal feet of 30-inch combined sewer, c. The abandonment of 30-inch sized sewer, including plug and grout installation at locations indicated on the Drawings. d. Abandonment of one (1) manhole. e. Removal of twenty five (25) manholes. f. Earth clearing and grubbing including tree removal. 1) Approximately 0.55 Acres of the project's proposed clearing and grubbing quantity has had tree topping performed. The Contractor is responsible for clearing and hauling these topped trees offsite. g. Asphalt and Concrete Pavement removal and replacement including roadway linear grading placing new aggregate base course, 10-inch reinforced concrete pavement, subgrade compaction and proof rolling. h. An aggressive support and dewatering system will be required since the sewer sits adjacent to the Mahoning River. The sewer installation will require preparation of a dry and stable excavation. i. An extensive bypass pumping plan will be required for the proposed improvements as high-volume wet weather flows are conveyed through the interceptor being replaced that will need to be bypassed to a downstream location within the City's sewer system. The system shall be fully operational, 24-hours a day, for the duration of the Project as needed for the improvements being performed. 1) Phase 1 of the West-Division Sewer Replacement Project may be under construction concurrently with Phase 2. Contractor shall coordinate bypass tie-in location and pump flow rates with Phase 1 contractor prior to setup. j. Removal and replacement of existing storm sewer pipe and structures. k. Additional site restoration including placement of erosion control blankets, top soil, seeding and mulching, and re-grading of existing drainage swales and features. l. The removal and disposal of contaminated soils and water as encountered throughout the project in accordance with all local, state and federal regulations. m. Contractor shall coordinate timing and execution with City Concrete for all construction activities that are on City Concrete's property or require use and access of City Concrete's property. Contractor shall provide a minimum of 3 weeks notice to City Concrete prior to accessing the City Concrete property, and shall not impede the operations at the site. Question Deadline 05/06/2025 All questions about the meaning or intent of the Bidding Documents shall be submitted to Engineer in writing. for receipt not later than three days prior to the date for the opening of Bids.

GC Bidding

Water / Sewer

$300,000.00

Public - City

Site Work

43

19

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Price and Payment Procedures, Allowances, Cash Allowances, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Temporary Facilities and Controls, Temporary Utilities, Construction Facilities, Vehicular Access and Parking, Traffic Control, Temporary Controls, Temporary Environmental Controls, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Construction Layout, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Scaffolding
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Erosion and Sedimentation Controls, Shoring and Underpinning, Concrete Raising, Pressure Grouting, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Mowing, Watering, Bases, Ballasts, and Paving, Planting, Planting Preparation, Mulching, Turf and Grasses, Plugging, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
87
Bidding Soon
1,407
All Active Projects
628
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2025

June 9, 2025

img_map_placeholder

West Dr, Youngstown, OH


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

West Division Interceptor Sewer Replacement Project Phase 2

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.