BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 3, 2025 at 8:00 PM

Updated June 4, 2025

Site work and paving for a mixed-use development in Rocky Mount, North Carolina. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; transportation facility; and transportation facility.

The project scope will include the construction of one 80'x100'Corporate Hangar building with a bathroom (building plans are performance based). Service utilities will be extended to the proposed hangar. The hangar site preparation will include a concrete paved apron (approximately 778 SY's) that ties into the adjacent taxiway with the associated grading and drainage. The project also includes an asphalt parking lot for auto access (approximately 110 tons of asphalt). It is anticipated that the contract award will be made to the lowest responsive and responsible bidder if an award is made. All Bidders should be aware that the date, time, and location for Proposal Submittal and Opening may be modified by Addendum All Contractors are hereby notified that they must have proper licenses under the state law for their trades. General Contractors are notified that applicable statues of North Carolina will be observed in receiving and awarding general contracts. The State Department of Transportation and the United States Government have agreed to reimburse the Owner for portions of the project costs. The Owner will not accept or consider proposals from any contractor whose name, at the time of opening of bids or award, appears on the current list of ineligible, contractors published by the Comptroller General of the United States under Section 5.6 (b) of the Regulations of the Secretary of Labor (29) CFR nor a proposal from any firm, corporation, partnership, or proprietorship in which an ineligible contractor who, at the time of the opening of bids or the award, is removed from the North Carolina Department of Transportation's list of prequalified contractors. All bidders must be prequalified by the NCDOT as a "Bidder" prior to submitting a bid and all Contractors and Subcontractors must be prequalified as a "Bidder" or "Subcontractor" prior to performing any work on this project. Each proposal shall be accompanied by a cash deposit or a certified check drawn on a bank or trust company insured by the Federal Deposit Insurance Corporation in an amount equal to not less than 5% of the proposal or a bid bond of 5% of the bid executed by a surety company licensed under the laws of North Carolina to execute such bonds. The deposits shall be made payable to the Owner and shall be retained by the Owner as liquidated damages in the event of the successful bidder fails to properly execute the contract within ten (10) days after award and to give satisfactory surety as required by law. By submitting a bid the Contractor certifies that he has under his direct control or at his disposal the men, equipment, and materials required to execute this work as specified. Lack of such control or availability of men, equipment or materials shall constitute failure to properly execute the Contract. Performance and Labor and Material Payment Bonds will be required for 100% of the Contract price, with a surety or sureties legally authorized to do business in the State of North Carolina. A bid may be withdrawn only as provided by the applicable statues of North Carolina. If a bid is withdrawn within 150 days of the bid opening, the Bid Guarantee shall be forfeited; provided that, if the request to withdraw is made not later than 72 hours after the opening of bids, and if the withdrawal is allowed, the Owner may return the bid guarantee. The project is conditioned upon the receipt of federal funding under provisions of the Airport and Airways Safety and Capacity Expansion Act of 1987 and most recently Wendell H. Ford Aviation Investment and Reform Act for 21st Century (AIR-21). Certain mandatory federal requirements apply to this solicitation and will be made part of any contract awarded. 1. Buy American Preference (Title 49 United States Code, Chap 501); 2. Foreign Trade Restriction (49 CFR Part 30); 3. Disadvantaged Business Enterprise (49 CFR Part 26); 4. Davis-Bacon Act (29 CFR Part 5); 5. Equal Employment Opportunity (Executive Order 11246 and 41 CFR Part 60); 6. Goals for Minority and Female Participation (41 CFR Part 60-4.2); 7. Certification of Non-Segregated Facilities (41 CFR Part 60-1.8); 8. Debarment, Suspension, Ineligibility and Voluntary Exclusion (49 CFR Part 29). 9. Drug-Free Workplace Act of 1988 (41 USC 702-706) NON-DISCRIMINATION CLAUSE: The Special Provisions (SPIG61) of the North Carolina Department of Transportation, apply to this contract. It is the policy of the Southeast Regional Airport Authority to practice nondiscrimination based on race, color, sex, or national origin in the award or performance of this contract. All firms qualifying under this solicitation are encouraged to submit bids/proposals. Award of this contract will be conditioned upon satisfying the requirements of this bid specification. These requirements apply to all bidders/offerors, including those who qualify as DBE. A DBE contract goal of 2% percent has been established for this contract. The bidder/offeror shall make good faith efforts, as defined in SPIG61 to meet the contract goal by utilizing DBE's in the performance of this contract. The apparent successful bidder will be required to submit in the "Proposal" section of his bid the information concerning the DBE(s) that will participate in this contract. This information will include: (1) the names, addresses and telephone numbers of DBE firms that will participate in the contract, and the certifying agency documentation of current status as a bona fide DBE; (2) a description of the work that each DBE firm will perform; (3) the dollar amount of the participation of each DBE firm participating (4) written documentation of the bidder/offeror's commitment to use a DBE subcontractor whose participation it submits to meet the contract goal; and (5) written confirmation from the DBE that is participating in the contract as provided in the commitment made under (4). If the bidder fails to achieve the contract goal stated herein, he will be required to provide documentation demonstrating that he made a good faith effort. The bidder's documentation shall be submitted in accordance with the provisions of SPIG61. The Owner reserves the right to reject any or all bids and to waive informalities and minor irregularities

Post-Bid

Transportation Terminals

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
190
Active Projects
107
Bidding Soon
1,397
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2025

June 13, 2025

Project location map

7265 Air Terminal Dr, Rocky Mount, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.