BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 24, 2026 at 7:00 PM

Updated February 25, 2026

Site work and paving for a civil project in Mammoth Hot Springs, Wyoming. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; and water / sewer project.

The project involves construction work for the Gardner River High Bridge under the Yellowstone, Grand Teton, and Surrounding Area MATOC. This Task Order Request for Proposal is limited to the listed MATOC prime contractors and includes providing proposals, plans, and physical data as specified in the attachments. The work will be performed in accordance with the requirements outlined for the WYNPS YELL 10(26) project, which is part of the Federal Lands Highway program. The solicitation is intended to announce the upcoming project and assist potential subcontractors by publicizing opportunities, though proposals will only be accepted from the designated prime contractors. ESTIMATED PRICE RANGE: Between $20,000,000 and $30,000,000. The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 10/19/2027. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Shortlist Confirmed

Award

Bridges / Tunnels

$22,434,479.00

Public - Federal

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2026

March 31, 2026

Project location map

To Be Determined, Mammoth Hot Springs, WY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.