Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 8, 2025 at 8:00 PM
Updated May 9, 2025
Site work and paving for a mixed-use development in Hawthorne, New Jersey. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
** As of 05/08/2025 project has been awarded to DLS Contracting but no amount available.** 2024 and 2025 Road Improvement Program and 2024 CDBG ADA Curb Ramp Improvements d for: 2024 AND 2025 ROAD IMPROVEMENT PROGRAM AND 2024 CDBG ADA CURB RAMP IMPROVEMENTS BOROUGH OF HAWTHORNE PASSAIC COUNTY, NEW JERSEY The work to be performed under this contract includes the following: Base Bid 1: 2024 Road Improvement Program: The milling and resurfacing of 4th Avenue from Van Winkle Avenue to Southern Dead End, Ethel Avenue from Van Winkle Avenue to Florence Avenue, and the entire length of Annette Avenue and Frederick Avenue. Contract work includes tree removal, selective root pruning, ancillary drainage improvements, ADA curb ramp improvements, curb reconstruction, and the installation of traffic stripes, markings, and regulatory and warning signs. Base Bid 2: Resident Assessment for the 2024 Road Improvement Program: The spot sidewalk and driveway replacement of the properties along 4th Avenue from Van Winkle Avenue to Southern Dead End, Ethel Avenue from Van Winkle Avenue to Florence Avenue, and along the entire length of Annette Avenue and Frederick Avenue. Base Bid 3: 2025 Road Improvement Program: The milling and resurfacing of Florence Avenue from Fifth Avenue to Eleventh Avenue, north side of North 13th Street from Prescott Avenue to Dead End, entire length of Tonia Terrace, Greenwood Avenue from Hillcrest Avenue to Municipal Limit, Woodland Avenue from Longview Court to Municipal Limit, and Highcrest Drive from Woodland Avenue to Municipal Limit. Contract work includes tree removal, ancillary drainage improvements, ADA curb ramp improvements, curb reconstruction, and the installation of traffic stripes, markings, and regulatory and warning signs. Base Bid 4: Resident Assessment for the 2025 Road Improvement Program: The spot sidewalk and driveway replacement of the properties along Florence Avenue from Fifth Avenue to Eleventh Avenue and North 13th Street from Prescott Avenue to Dead End. Contract work also includes tree removal. Base Bid 5: 2024 CDBG ADA Curb Ramp Improvements: ADA curb ramp improvements at Cathy Avenue and Henry Avenue Intersection, Cathy Avenue and Sherman Avenue Intersection, Sherman Avenue and Kaywin Avenue Intersection, and Jefferson Place and Grand Avenue Intersection. Alternate Bid: McKinley Avenue, Garfield Avenue, and North Highcrest Drive Improvements: Milling and resurfacing the entire length of North Highcrest Drive from Highcrest Drive to Dead End, Garfield Avenue and McKinley Avenue from Lafayette Avenue to Grand Avenue. Contract work includes tree removal, selective root pruning, ancillary drainage improvements, ADA curb ramp improvements, curb reconstruction, and the installation of traffic stripes, markings, and regulatory and warning signs. Contract work also includes spot sidewalk and driveway replacement of properties along the entire length of Garfield Avenue and along McKinley Avenue from Lafayette Avenue to Grand Avenue. Principal items of work in the project include: Base Bid 1: 2024 Road Improvement Program: . 18,965 S.Y. HMA Milling, 3" or less . 2,785 Ton Hot Mix Asphalt 9.5M64 Surface Course . 3,600 L.F. 9" x 18" Concrete Vertical Curb Base Bid 2: Resident Assessment for the 2024 Road Improvement Program: . 819 S.Y. Concrete Sidewalk, 4" Thick . 529 S.Y. Concrete Driveway, 6" Thick Base Bid 3: 2024 Road Improvement Program: . 15,195 S.Y. HMA Milling, 3" or less . 2,245 Ton Hot Mix Asphalt 9.5M64 Surface Course . 2,525 L.F. 9" x 18" Concrete Vertical Curb Base Bid 4: Resident Assessment for the 2025 Road Improvement Program: . 450 S.Y. Concrete Sidewalk, 4" Thick . 158 L.F. 9" x 18" Concrete Vertical Curb Base Bid 5: 2024 CDBG ADA Curb Ramp Improvements: . 190 S.Y. Concrete Sidewalk, 4" Thick . 290 L.F. 9" x 18" Concrete Vertical Curb Alternate Bid: McKinley Avenue and Garfield Avenue Improvements: . 3,300 S.Y. HMA Milling, 3" or less . 485 Ton Hot Mix Asphalt 9.5M64 Surface Course . 178 S.Y. Concrete Sidewalk, 4" Thick (Resident Assessment) . 375 L.F. 9" x 18" Concrete Vertical Curb The work contemplated under this Contract shall be completed within 100 calendar days of notice to proceed. Each bid must be made upon the prescribed forms, furnished with the contract documents, including the non-collusion affidavit and ownership statement compliance form and must be accompanied by a Consent of Surety and a certified check, cashier's check, or Bid Bond of not less than ten (10%) percent of the amount bid and, not to exceed $20,000.00. Such checks and Bonds shall be made payable to the Owner and will be held as a Guarantee that in the event the Bid is accepted and a Contract awarded to the bidder, the Contract shall be duly executed and its performance properly secured. The successful bidder shall furnish and deliver to the Owner a performance and payment bond in the amount of 100 percent of the accepted bid amount as security for the faithful performance and payment of the Contract. Further, the successful bidder must furnish the policies or Certificates of Insurance required by the Contract. The successful bidder will be required to comply with all provisions of prevailing wage rates as determined by the New Jersey Department of Labor. NJ law requires the contractor pay the HIGHER of State prevailing wages or Davis-Bacon, for each class of worker. All bids shall be irrevocable, not subject to withdrawal and shall stand available for a period of sixty (60) days The Owner reserves the right to reject any and all bids, to waive informalities or irregularities in the bids received and to accept the bid from the lowest responsible bidder. Prevailing wages established under the Davis-Bacon Act will apply to this contract. The contract documents contain requirements addressing prevailing labor wage rates, labor standards, nondiscrimination in hiring practices, goals for minority and female participation, MBE and WBE participation, and related matters
Award
Roads / Highways
$400,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 1, 2025
June 2, 2025
Multiple Locations, Hawthorne, NJ
Related To This Project
Hawthorne, NJ
Bid Date: May 28 2025
Hawthorne, NJ
Bid Date: Jul 02 2025
Hawthorne, NJ
Bid Date: Oct 28 2025
Hawthorne, NJ
Bid Date: Nov 13 2025
Hawthorne, NJ
Bid Date: Dec 18 2025
Hawthorne, NJ
Bid Date: Jan 21 2026
Hawthorne, NJ
Bid Date: Dec 12 2024
Hawthorne, NJ
Bid Date: Nov 22 2024
Hawthorne, NJ
Bid Date: Nov 07 2024
Hawthorne, NJ
Bid Date: Oct 08 2024
Hawthorne, NJ
Bid Date: Aug 29 2024
Hawthorne, NJ
Bid Date: Jul 16 2024
Hawthorne, NJ
Bid Date: May 29 2024
Hawthorne, NJ
Bid Date: Jun 04 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
