Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 23, 2025 at 8:00 PM
Updated April 26, 2025
Site work and paving for a sidewalk / parking lot in Pittsburgh, Pennsylvania. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Brief Scope of Work: Milling, repaving, regrading, and restriping of multiple lots located around PPG Arena. Contractor is to confirm all measurements prior to bid package, any discrepancies should be noted in the bid package in unit price allowance. Line striping must conform to PennDOT standards. All surfaces must be prepared properly, and work site must be cleaned after work completion. Bids shall be sealed and submitted on the Bid form provided. Bids will be opened publicly. The contract will be a prime contract with the Owner. Bid pricing (for base bid and/or alternates) may be held open by Owner for a period of ninety (90) days following bid opening before award of contract. All Bids will require a ten percent (10%) surety in the form of a Bid Bond, a certified check, or cashier's check in the amount of no less than ten percent (10%) of the total amount of the Base Bid (unless otherwise noted in the Bid Form Document). The surety is required as a guarantee that the bidder will, if awarded the contract, enter into a written contract with the Owner. All sureties must be licensed to conduct business in the Commonwealth of Pennsylvania. Bid Bonds should name Owner as obligee. All checks should be made payable to the order of Owner. Non-Collusion Affidavit of Prime Bidder Certificate of Minority and Women Business Enterprise Participation Public Works Employment Verification Form. Acknowledgement of Workforce Utilization. MBE and WBE Solicitation Statement. The SEA has goals of 25% MBE and 10% WBE participation in this project. Bidders must provide a completed Certificate of MBE/WBE Participation form and a Solicitation Statement with their bid. Questions Due - Monday, April 14, 2025 1. PPG Arena East Lot a. Mill & Pave approximately 67,900 SF / 7,545 SY i. Option #1 1. Mill Existing Surface - 2" 2. Compact Existing Base 3. 2.5" Asphalt Binder Course a. Includes tack coat 4. 1.5" Asphalt Wearing Course a. Includes, placement, rolling, finishing, sweeping ii. Option #2 1. Mill Existing Surface - 2" 2. Compact Existing Base 3. 2" Wearing Course a. Includes, placement, rolling, finishing, sweeping b. Striping to replace existing - 235 Spaces 2. PPG Arena Employee Lot a. Mill & Pave approximately 36,840 SF / 4,094 SY a. Includes, placement, rolling, finishing, sweeping ii. Option #2 1. Mill Existing Surface - 1"-2" 2. Compact Existing Base 3. 2" Wearing Course a. Includes, placement, rolling, finishing, sweeping b. Striping to replace existing - 470 Spaces 6. URA Melody Tent Lot B a. Mill & Pave approximately 91,226 SF / 10,137 SY i. Option #1 1. Mill Existing Surface - 1"-2" 2. Compact Existing Base 3. 2.5" Asphalt Binder Course a. Includes tack coat 4. 1.5" Asphalt Wearing Course a. Includes, placement, rolling, finishing, sweeping ii. Option #2 1. Mill Existing Surface - 1"-2" 2. Compact Existing Base 3. 2" Wearing Course a. Includes, placement, rolling, finishing, sweeping b. Striping to replace existing - 380 Spaces ALTERNATE 1 1. Fullerton Gravel Lot a. Regrade Gravel - 34,760 SF / 3,862 SY b. Striping for standard parking, no ADA
Post-Bid
Sidewalks / Parking Lot
$500,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 25, 2025
May 26, 2025
Multiple Locations, Pittsburgh, PA
Related To This Project
Pittsburgh, PA
Bid Date: May 13 2025
Pittsburgh, PA
Bid Date: Jul 08 2025
Pittsburgh, PA
Bid Date: Apr 29 2025
Pittsburgh, PA
Bid Date: May 06 2025
Pittsburgh, PA
Bid Date: May 23 2025
Pittsburgh, PA
Bid Date: May 27 2025
Pittsburgh, PA
Bid Date: May 15 2025
Pittsburgh, PA
Bid Date: May 12 2025
Pittsburgh, PA
Bid Date: Apr 17 2025
Pittsburgh, PA
Bid Date: Apr 15 2025
Pittsburgh, PA
--
Pittsburgh, PA
Bid Date: Apr 09 2025
Pittsburgh, PA
Bid Date: Apr 30 2025
Pittsburgh, PA
Bid Date: Apr 15 2025
Pittsburgh, PA
Bid Date: Apr 15 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
