Site work for a water / sewer project in Anderson, South Carolina. Completed plans call for site work for a water / sewer project.

The project will be bid and constructed in two (2) separate Divisions, and generally consists of the following: Division 1 - East Market Street Area: Approximately 1,900 LF of 6-inch waterline, 2,150 LF of 2-inch waterline, three (3) fire hydrants, 50 service reconnections, water system connections, water main abandonment, pavement replacement, traffic control, and all other items required for a complete and proper installation. Division 2 - Wellington Mill Area: Approximately 3,200 LF of 6-inch waterline, 11,365 LF of 2-inch waterline, five (5) fire hydrants, 125 service reconnections, water system connections, water main abandonment, pavement replacement, traffic control, and all other items required for a complete and proper installation. Questions regarding the bid are to be submitted before 5:00 PM local time on Wednesday, May 14th, 2025. Div 1 - E. Market St Area: Approximately 1,900 LF of 6-in waterline & 2,150 LF of 2-in waterline. Div 2 - Wellington Mill Area: Approximately 3,200 LF of 6-in waterline & 11,365 LF of 2-in waterline. Div 1 - Bidder hereby agrees to commence work under this contract on or before a date to be specified in written "Notice to Proceed" of the Owner and to fully complete the project within two hundred and ten (210) consecutive calendar days thereafter as stipulated in the specifications. Bidder further agrees to pay as liquidated damages the sum of $500.00 for each consecutive calendar day thereafter as hereinafter provided in Paragraph 19 of the General Conditions. Div 2 - Bidder hereby agrees to commence work under this contract on or before a date to be specified in written "Notice to Proceed" of the Owner and to fully complete the project within three hundred (300) consecutive calendar days thereafter as stipulated in the specifications. Bidder further agrees to pay as liquidated damages the sum of $500.00 for each consecutive calendar day thereafter as hereinafter provided in Paragraph 19 of the General Conditions. Bid Results :: Division 1 :: LW Inc. :: $793,000.00 Division 2 :: LW, Inc. :: $2,041,600.00

Bid Results

Water / Sewer

$2,834,600.00

Public - City

Site Work

32

9

2

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
176
Active Projects
80
Bidding Soon
1,137
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2025

June 19, 2025

Project location map

Multiple Locations, Anderson, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.