BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 30, 2025 at 8:00 PM

Updated December 3, 2025

Demolition, site work, renovation and addition to an educational facility in Boulder, Colorado. Design plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

As of October 30, 2025, this project is in the design phase. Construction is expected to start in early 2026. Reference Number 0000383206 The University of Colorado Boulder seeks architectural and engineering design services for the expansion of the Transportation Services Maintenance Facility. This project will begin as a study through Schematic Design and include a cost estimate at the conclusion of that phase. These final deliverables will be used by the university to assess the viability, schedule, and construction delivery method for the potential project. If the university chooses to proceed, these deliverables will serve as bridging documents for future design and construction phases. Depending on the delivery method selected, the university may amend the initial contract of the selected architectural and engineering team to include full design services. The existing facility lacks adequate space to support CU Boulder's maintenance operations for a mixed fleet of approximately 500 vehicles, including 27 fully maintained buses. The current four-bay configuration is insufficient for expanding technician capacity and does not provide the clearance needed to safely lift medium and heavy-duty vehicles or to service all-electric buses with roof-mounted battery packs. The project will include the design of two additional maintenance bays, which will require the removal of a modular unit currently attached to the west side of the existing facility. As part of the study, the design team may also evaluate a small number of offices within the existing bus service bay to determine together with the CU Boulder team whether they should be included in the final project scope. The selected design team will be responsible for delivering planning level designs, including site analysis, identification of zoning and code constraints, fabrication recommendations, and siting options for the proposed maintenance bays. The entire project site is located within the 100-year floodplain, with areas falling in both FEMA Zones AO and AE (refer to floodplain map and site boundary in the appendices). As such, it is anticipated that the design team will need to include a qualified floodplain engineer as part of their subconsultant team to address site-specific challenges. Question Deadline 04/28/2025 at 2:00 PM MT Questions are submitted online Yes Anticipated Construction Services - Start/Finish December, 2025

Design

Educational

$570,000.00

Public - State/Provincial

Addition, Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
1
Bidding Soon
886
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.