Site work and paving for a sidewalk / parking lot in Castle Pines, Colorado. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Reference Number 0000383348 Bid Intent Not Available Job Location: Castle Pines Project Description: The work performed under this contract generally consists of reconstructing Castle Pines Parkway eastbound, from around Forest Park Drive to Monarch Blvd. This project will reconstruct Eastbound Castle Pines Parkway from Forest Park Drive to Monarch Boulevard. The work includes removing the existing concrete pavement and curb and gutter, chemically treating the subgrade, placing new curb and gutter, and paving 6" of new HMA. Due to the proximity of Timber Trail Elementary School, work is scheduled to occur during the summer with a fixed completion date of August 9th. Please see the ITB for bonding, insurance, and other requirements. Each Bid must be accompanied, in a sealed envelope, separate from the one containing the Bid, by a Bid Bond. Bid Security shall be on an approved form. Bid security for construction contracts in any amount greater than $50,000 but less than $500,000 shall be in an amount that covers 5 percent (5%) of the estimated project cost. Bid security for construction contracts in any amount greater than $500,000 shall be in an amount that covers 10 percent (10%) of the estimated project cost. of the Bid price, made payable to the City of Castle Pines, which shall be considered as liquidated damages and shall be forfeited to the City if said Bid is accepted and the Bidder fails to execute the Contract Documents section within ten (10) calendar days after the Award by the City. The successful Bidder will be required to furnish, as part of the Contract, insurance certificates in the amount specified in the General Conditions, a Performance, Payment, Maintenance and Warranty Bond in an amount equal to one-hundred percent (100%) of the Contract Sum, said bond to be issued by a responsible corporate surety approved by the City, and which shall guarantee the faithful performance of the Construction Contract and the terms and conditions therein contained and shall guarantee the prompt payment of all materials and labor, and protect and save harmless the City from claims and damages of any kind caused by the operations of the Contractor. Question Deadline 04/25/2025 at 3:00 PM MT Questions are submitted online Yes Each Bid shall be made on the Form of Bid provided in the bid packet, and no Bidder may withdraw his Bid for a period of ninety (90) days from and after the date set for opening of bids. The City reserves the right to waive informalities or irregularities and to reject any or all Bids. Capitalized terms have the meaning assigned in the General Conditions.

Bid Results

Sidewalks / Parking Lot

$1,845,188.00

Public - City

Paving, Site Work

95

14

50

7

Subscribe For Documents

88 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
178
Active Projects
62
Bidding Soon
1,264
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2025

June 2, 2025

Project location map

Castle Pines Pkwy, Castle Pines, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.