Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 26, 2025 at 8:00 PM
Updated April 27, 2025
Site work and paving for a road / highway in Firestone, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Reference Number 0000383495 Project Description: The work will consist of a Chip Seal on Arterial and Collector Streets, including preparation of road surfacing, patching, the surface treatment, fog seal, striping, thermos plastic and restoration as needed. Street Sweeping as directed by the Town, and resident/public notification is required prior to start of work. This is in addition to a publicly held neighborhood information meeting (as necessary). The Town of Firestone will require 24-hour a day contact(s) throughout the duration of the project and work with Town staff to address safety sensitive issues and residents' concerns in a timely manner. List of the roads to be resurfaced and approximate lengths: Sable Ave (CR 22) - 1.2 mile: I-25 frontage E. .25 miles & Colorado Blvd (CR 13) to Frontier (CR 15) Birch Ave (CR 11) - 1.5 mile: Town Limits (south) .5 miles N. of Bella Rosa PKWY to Firestone BLVD (CR 24) Frontier Ave (CR 15) - 1.0 mile: Sable (CR 22) to Firestone Blvd Colorado BLVD (CR 13) - 1.4 mile: Mountain Shadows BLVD to CR 26 then CR 26 North 1/2 mile All existing striping and thermoplastics are to be reinstalled. Traffic control, resident notification, and Stormwater BMP compliance are required. The Top Ranked Contractor is responsible for tracking material used for payment. If the quantities specified in the unit price form are insufficient to complete the work, The contractor shall note that at the bottom of the bid tab under "Please note any exceptions you take with this bid". All Towns Standards and Specifications are to be followed. This is to include the procedures outlined in the Town's Street, Curb, and Gutter Maintenance/Replacement Standards and Specifications to ensure stormwater compliance, including installation and maintenance of stormwater control measures, which can be found here. May 15, 2025 Notice to Award May 26, 2025 Notice to Proceed Question Deadline 04/21/2025 at 2:00 PM MT, All answers to questions received will be sent in a formal addendum (if needed), by April 22, 2025. Questions are submitted online No, All questions related to this bid should be emailed to ghubert@firestoneco.gov
Post-Bid
Roads / Highways
$400,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 25, 2025
June 1, 2025
Multiple Locations, Firestone, CO
Related To This Project
Firestone, CO
Bid Date: Apr 25 2025
Firestone, CO
Bid Date: Oct 02 2025
Firestone, CO
--
Firestone, CO
--
Firestone, CO
Bid Date: Mar 14 2025
Firestone, CO
Bid Date: Mar 07 2025
Firestone, CO
--
Firestone, CO
Bid Date: Feb 11 2025
Firestone, CO
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
